The list of 12 operational Major Ports in the country under the administrative control of the Central Government is available at Annexure-1. Further, two new ports, i.e., Vadhavan Port in Maharashtra and Galathea Bay Port in Andaman and Nicobar Islands, have been notified as Major Ports. The list of 68 operational Other than Major Ports (OTMPs), under the administrative control of the respective State Governments, is available at Annexure - 2. As per the information received from the Government of Andhra Pradesh, the details of ports, which are under construction in Andhra Pradesh, are as follows:
- Mulapeta Port (formerly Bhavanapadu Port), Srikakulam District
- Machilipatnam Port, Krishna District
- Ramayapatnam Port, SPSR Nellore District
- Kakinada SEZ Port, Kakinada District
The Government has undertaken several measures for the modernisation of ports, including the mechanization of existing berths and terminals, digitalisation and logistics integration, construction of new berths and terminals, capital dredging for increasing drafts suitable for larger vessels, development of road, rail and waterways connectivity, etc. In addition, several initiatives such as elimination of manual forms, facilitation of direct port delivery and entry, installation of container scanners, e-delivery of orders/ invoice/ payments, RFID-based gate-automation system, implementation of Maritime Single Window -SagarSetu 2.0have been undertaken to reduce vessel turnaround time and improve efficiency.
The Government has launched several schemes, missions, and initiatives for the development, expansion, and upgradation of ports across the country. Under the Sagarmala scheme, financial assistance is provided under five pillars, namely, Port Modernization, Port Connectivity, Port-Led Industrialization, Coastal Community Development, and Coastal Shipping and Inland Water Transport, to the implementing agencies like States/ UTs Governments, major ports, and other organisations. The ‘HaritSagar’ green port guidelines have been launched to promote an environment-friendly ecosystem at major ports. The Green Tug Transition Programme (GTTP) has been initiated to drive the transition from conventional fuel-based harbour tugs to greener and sustainable alternatives. In addition, the Government has launched the Cruise Bharat Mission to prioritize cruise tourism development.
The details of funds allocated, sanctioned, and released under the Port Modernisation pillar of the Sagarmala scheme for port development and modernisation including Andhra Pradesh is available at Annexure – 3.
Annexure- 1
The list of 12 Major Ports:
|
Sl.No.
|
Name of Major Port
|
State
|
|
1
|
Syama Prasad Mookerjee Port Authority
|
West Bengal
|
|
2
|
Paradip Port Authority
|
Odisha
|
|
3
|
Visakhapatnam Port Authority
|
Andhra Pradesh
|
|
4
|
Chennai Port Authority
|
Tamil Nadu
|
|
5
|
Kamarajar Port Limited
|
|
6
|
V.O. Chidambaranar Port Authority
|
|
7
|
Cochin Port Authority
|
Kerala
|
|
8
|
New Mangalore Port Authority
|
Karnataka
|
|
9
|
Mormugao Port Authority
|
Goa
|
|
10
|
Mumbai Port Authority
|
Maharashtra
|
|
11
|
Jawaharlal Nehru Port Authority
|
|
12
|
Deendayal Port Authority
|
Gujarat
|
Annexure – 2
The list of 68 operational Other Than Major Ports (OTMPs):
|
Sl. No.
|
Name of States / Ports
|
Sl. No.
|
Name of States / Ports
|
|
|
GUJARAT
|
|
GOA
|
|
1
|
Alang
|
1
|
Panaji
|
|
2
|
Bedi
|
|
KARNATAKA
|
|
3
|
Bhavnagar
|
1
|
Karwar
|
|
4
|
Dahej
|
2
|
Old Mangalore
|
|
5
|
Jafarabad
|
|
ANDAMAN & NICOBAR
|
|
6
|
Jakhau
|
1
|
Campbell Bay
|
|
7
|
Magdalla
|
2
|
Diglipur (Port Cornwalis)
|
|
8
|
MagdallaHazira Port (AHPPL)
|
3
|
SwarajDweep (Havelock)
|
|
9
|
Magdala Adani Hazira Port
|
4
|
Hut Bay
|
|
10
|
Navlakhi
|
5
|
Katchal (East Bay)
|
|
11
|
Okha
|
6
|
Malacca Car Nicobar (East)
|
|
12
|
Pipavav (GPPL)
|
7
|
Mayabunder
|
|
13
|
Porbandar
|
8
|
NancowryHarbour (Camotra)
|
|
14
|
Sikka
|
9
|
Shaheed Dweep (Neil Island)
|
|
15
|
MandaviMundra
|
10
|
Port Blair
|
|
16
|
MandaviMundra Port &SEZ
|
11
|
Rangat (ElephinstonHarbour)
|
|
17
|
Veraval
|
|
TAMIL NADU
|
|
18
|
Salaya
|
1
|
Cuddalore
|
|
|
MAHARASHTRA
|
2
|
Ennore Minor Port
|
|
1
|
Bankot
|
3
|
Kattupalli
|
|
2
|
Bhiwandi
|
4
|
Koodankulam
|
|
3
|
Dahanu
|
5
|
Thirukkadaiyur
|
|
4
|
Dabhol
|
6
|
Nagapattinam
|
|
5
|
Dharamtar (Alibag)
|
7
|
Udangudi
|
|
6
|
Jaigad
|
|
PUDUCHERRY
|
|
7
|
Karanja
|
1
|
Karaikal
|
|
8
|
Rajpuri / Dighi
|
2
|
ChemplastSanmarKaraikal
|
|
9
|
Ratnagiri
|
3
|
Puducherry
|
|
10
|
Redi
|
|
ODISHA
|
|
11
|
Revdanda
|
1
|
Gopalpur
|
|
12
|
Ulwa-Belapur (Panvel)
|
2
|
Dhamra
|
|
13
|
Vasai
|
|
KERALA
|
|
14
|
Vijaydurg
|
1
|
Beypore
|
|
15
|
Belapur
|
2
|
Kollam
|
|
16
|
Yogayatan
|
3
|
Azhikkal
|
|
|
ANDHRA PRADESH
|
|
|
|
1
|
Kakinada Anchorage Port
|
|
|
|
2
|
Kakinada Seaports Port
|
|
|
|
3
|
Rawa
|
|
|
|
4
|
Krishnapatnam
|
|
|
|
5
|
Gangavaram
|
|
|
Annexure - 3
The list of projects under Port Modernization pillar funded under Sagarmala scheme
|
Sl.No.
|
Name of Project
|
State / UT
|
Project cost
(in ₹ crore)
|
Assistance under Sagarmala
(in ₹ crore)
|
Funds released (in ₹ crore)
|
Status
|
|
1.
|
Improvement of Kakinada Anchorage Ports infrastructure in East Godavari district, Andhra Pradesh
|
Andhra Pradesh
|
73.34
|
36.67
|
36.67
|
Completed
|
|
2
|
Recycling/Reuse of Sewage Treated Water from Sewarage Infrastructure Development Corporation of goa Ltd (SIDCGL) located at KatemBaina, Goa
|
Goa
|
3.18
|
3.18
|
3.02
|
Completed
|
|
3
|
Removal of 2 Nos. Mooring of Spiral in the area of Cruise Berth – Mormugao, Goa
|
Goa
|
13.87
|
6.94
|
6.94
|
Completed
|
|
4
|
Installation of 3 MWp Solar Power Plant with Virtual Net Metering on Turnkey Basis at Murmugoa Port, Goa
|
Goa
|
11.90
|
5.93
|
5.93
|
Completed
|
|
5
|
Installation of Fire Fighting Equipment at Karwar Port, Karnataka
|
Karnataka
|
18.21
|
9.10
|
8.65
|
Completed
|
|
6
|
Refurbishment and Capacity enhancement of Coastal liquid terminal -COT and NTB at Cochin Port, Kerala
|
Kerala
|
19.27
|
14.45
|
14.45
|
Completed
|
|
7
|
Reconstruction of South Coal Berth at Cochin Port for handling chemicals, Kerala
|
Kerala
|
19.30
|
10.55
|
10.55
|
Completed
|
|
8
|
Construction of Third Chemical Berth at Pirpau, Mumbai Port, Maharashtra
|
Maharashtra
|
161.00
|
140.46
|
140.46
|
Completed
|
|
9
|
SCADA and PLC automation system at Marine Oil Terminal at Mumbai Port, Maharashtra
|
Maharashtra
|
22.77
|
22.77
|
22.77
|
Completed
|
|
10
|
Capital Dredging for Puducherry Port, Puducherry
|
Puducherry
|
27.65
|
27.45
|
27.45
|
Completed
|
|
11
|
Development and Operation of a full-fledged Truck Parking Terminal adjacent to NH7A opposite to Fisheries college at V. O. Chidambaranar Port
|
Tamil Nadu
|
23.69
|
10.00
|
10.00
|
Completed
|
|
12
|
Construction of Breakwater both in North and South side of entrance channel- Berth-1- Berth-2 and Capital Dredging at Cuddalore Port -From entrance channel till cargo berths
|
Tamil Nadu
|
135.00
|
67.50
|
67.50
|
Completed
|
|
13
|
Development of paved storage yard at Chennai Port for handling export cargo
|
Tamil Nadu
|
51.46
|
25.73
|
25.73
|
Completed
|
|
14
|
Construction of Bunker berth at Chennai Port
|
Tamil Nadu
|
44.00
|
22.00
|
22.00
|
Completed
|
|
15
|
Dredging the dock basin for coastal cargo berth at VOCPT -Dredging in front of dedicated coastal berth
|
Tamil Nadu
|
98.00
|
20.89
|
20.89
|
Completed
|
|
16
|
Development of Buffer Parking yard for Trailers / Trucks at the backup areas of Berth No. 24B(BD-II) in Chennai Port
|
Tamil Nadu
|
49.06
|
39.42
|
39.42
|
Completed
|
|
17
|
Design, Engineering & Construction for Rehabilitation of No.7, NSD Old Berth including Development of Backyard at N.S. Dock of KDS - SMP, Kolkata’
|
West Bengal
|
80.74
|
80.74
|
80.74
|
Completed
|
|
18
|
Augmentation of Firefighting facilities at Berth no. 8 of Murmugoa Port
|
Goa
|
17.76
|
8.88
|
7.10
|
Under Implementation
|
|
19
|
Augmentation of Firefighting facilities at Pir Pau Terminal of Mumbai Port
|
Maharashtra
|
52.69
|
26.34
|
25.03
|
Under Implementation
|
|
20
|
Development of paved storage yard at marshalling yard and JD (east) back up area for handling EXIM cargoes at Chennai Port
|
Tamil Nadu
|
45.90
|
22.95
|
4.51
|
Under Implementation
|
|
21
|
Smart Lighting on Willingdon Island at Cochin Port
|
Kerala
|
2.01
|
2.01
|
0.00
|
Under Implementation
|
|
22
|
2.3 MWp roof mounted grid connected solar photo voltaic power plant at Khidderpore Dock-II, SMPA
|
West Bengal
|
30.70
|
15.35
|
3.07
|
Under Implementation
|
|
23
|
Extension and improvement of loading platform of full rake line no. 8 and modification to railway infrastructure for handling two rakes at Murmugoa Port
|
Goa
|
12.58
|
12.58
|
0.00
|
Under Implementation
|
|
24
|
Revamping/upgradation of 6 (Six) roads in port operational areas of KDS under SMPA
|
West Bengal
|
19.35
|
9.68
|
7.74
|
Under Implementation
|
This information was given by the Union Minister of Ports, Shipping, and Waterways, Shri Sarbananda Sonowal, in a written reply to the Lok Sabha.
***