|
S. No.
|
State / UT
|
Project
|
Implementing Agency
|
-
|
Assam
|
Carbonated Water Injection (CWI) is planned in one of OIL’s reservoirs in Dikom field located in its operational areas in Assam.
|
Oil India Ltd (OIL)
|
-
|
Assam
|
Feasibility Study of CO2 EOR Including CO2 Transportation & Injection in Makum-North Hapjan Field of Assam
|
Oil India Ltd (OIL)
|
-
|
Assam
|
Revitalization of Kathaloni LK+TH Sand (KLN001 Block) Reservoir through Modelling Study along with Identification of Potential for Amenable EOR Scheme in Kathaloni Oilfield
|
Oil India Ltd (OIL)
|
-
|
Assam
|
CO + CO₂ Recovery (270 TPD + 190 TPD) at Numaligarh
|
Numaligarh Refinery Limited (NRL)
|
-
|
Andhra Pradesh
|
Vacuum Swing Adsorption Process for Carbon dioxide Capture from Cement Kiln Gas and its Utilization within the Construction Material Value Chain.
|
Knowledge
Partner-
CSIR-Indian Institute of
Petroleum (CSIR-IIP),
Dehradun, IIT-Tirupati and IISc, Bengaluru.
Industry
Partner- JSW Cement
Ltd.
|
-
|
Gujarat
|
1,500 TPD CO₂‑ Enhanced Oil Recovery (EOR) at Gujarat refinery, Vadodara
|
Indian Oil Corporation Ltd (IOCL) + Oil and Natural Gas Corporation Limited (ONGC Ltd.)
|
-
|
Gujarat
|
Initiative on the feasibility of CCUS in form of CO2-EOR in the mature water flooded reservoirs of Gandhar in Gujarat.
|
Oil and Natural Gas Corporation Limited (ONGC Ltd.)
|
-
|
Madhya Pradesh
|
15 TPD CO₂‑ to‑ Calcium Carbonate Plant (Bina Refinery) at Bina
|
Bharat Petroleum Corporation Limited (BPCL)
|
-
|
Haryana
|
440 TPD CO₂‑ to‑ Acetic Acid (Panipat Refinery) at Panipat
|
Indian Oil Corporation Ltd (IOCL)
|
-
|
Odisha
|
132 TPD CO₂‑ to‑ Polycarbonate at Paradip Refinery
|
Indian Oil Corporation Ltd (IOCL)
|