1
|
Improvement of Amritsar bypass by construction of addtional structures and service road on NH-1 between km 448+510 to km 473+068 on the state of Punjab on EPC (PIU-Jalandhar)
|
Amritsar
|
24.55
|
10.11.2018
|
2
|
ROB at Amritsar in Km.112.50 on LC No. A/12/B/2 along with HLB over adjoining UBDC Canal.
|
Amritsar
|
0.00
|
March, 2019
|
3
|
Consultancy for conducting FS & preparing DPR for newly declared NH 503Ai.e. ASR -Mehta-Sri Hargobindpur Tanda Hoshiarpur Una Road
|
Amritsar & Hoshiarpur
|
0
|
Work Completed
|
4
|
4-laning of Amritsar-Taran Tran-Harike section of NH-15 from Km 112.575 to 158.350
|
Amritsar & Tarntaran
|
45.775
|
Work completed
|
5
|
Reconstruction/Widening of culverts at km 296.770, 305.160 & km 316.400
|
Bathinda
|
0
|
Nov, 2018
|
6
|
Const. of H/L Br. 5 span 50.91 m over Lisara Drain at vill.Sangar x-ingkm.21.948 & const. of H/L Br. 6 span 67.91 m over Lisara Drain at vill.Pathrala in km 36.72 sec.bti.-dabwali rd. CWD BTI.
|
Bathinda
|
-
|
Work completed
|
7
|
Road safety Km. 0.00 to 40.440 on section Bathinda-Dabwali
|
Bathinda
|
0.00
|
Work completed
|
8
|
Up-gradation for Rampura-Maur section of NH-254 in Km 82.40 to 104.20
|
Bathinda
|
21.80
|
Work completed
|
9
|
Widn. To 2 - L with P/S & STG. In Km 0.00-16.490 of NH 754 Bathinda Mukatsar Jalalabad road
|
Bathinda
|
16.49
|
Work Completed
|
10
|
ROB at Maur in Km 105.05 on LC No. C-221
|
Bathinda
|
0.00
|
Nov, 2018
|
11
|
ROB at Bathinda in Km 7.60 on LC No. C-184/B
|
Bathinda
|
0.00
|
Oct, 2018
|
12
|
Up-gradation for NH-254 section Rampura-Maur-Talwandi Sabo-Raman Mandi in Km 104.200 to 132.00
|
Bathinda
|
26.41
|
Sept., 2018
|
13
|
4-laning of Bathinda Malout road km 292.00 to 293.00 (Bathinda city)
|
Bathinda
|
1.00
|
Work Completed
|
14
|
4-laning of Bathinda-Dabwali section of NH-64A from Km 35.00 to 40.440
|
Bathinda
|
5.44
|
Work Completed
|
15
|
4-laning of Tapa –Bathinda section of NH-64 from Km 168.00 to 209.405
|
Bathinda
|
41.445
|
Work completed
|
16
|
ROB at Faridkot on Km. 223.70 on LC No. 31/B
|
Faridkot
|
0.00
|
March, 2019
|
17
|
ROB at Kotkapura in Km. 236.00 on LC No. SPL-26
|
Faridkot
|
0.00
|
March, 2019
|
18
|
4-laning of Faridkot-Kotkapura-Bathinda section of NH-15 from Km 221.380 to 287.615
|
Faridkot & Batinda
|
62.115
|
Work completed
|
19
|
Const. of 2mtr single span bridge over Aspal drain crossing ABOHAR-FAZILKA Road in km. 392.450.
|
Fazlika
|
-
|
Work completed
|
20
|
Widening of bridge of 4 span 6.00m RCC slab type bridge over Tahliwala drain at Km. 403.100 and 4 span 8.00m RCC slab type bridge over Korianwall Drain km. 405.850 on Abohar Fazilka sec.
|
Fazlika
|
-
|
Work completed
|
21
|
Const.of Bridge in Ditch drain at km/RD 413.400 Sec.Fazilka-Sulemannke border (Near Fazilka)
|
Fazlika
|
-
|
Work completed
|
22
|
Constn. Of propossed Bridge Sabuana Drain at km.418.30 NH.10 Sec. Fazilka-Sulemanke road CWD Abohar
|
Fazlika
|
-
|
Work completed
|
23
|
Providing service lanes on DHS road. Sec.MALOUT-ABOHAR from km.348.550 - 351.700
|
Fazlika
|
3.15
|
Work completed
|
24
|
Providing service lane on Sec.ABOHAR-USMANKHERA road from km.389.400-391.100
|
Fazlika
|
1.70
|
Work completed
|
25
|
Imp.of Accident Black Spot by providing Bus Lay Byes,Improvement of T-junction &providing 4-Laning/Service Lane 5.5m wide on both side of DHS-Road Sec.DABWALI -MALOUT in km.319-323 Vill Mehna&km.329.00 vill.LAMBI Sub Tehsil, on MALOUT-ABOHAR Sec.in km.366/367 Vill/BALLUANA&on Sec.ABOHAR -FAZILKA in km.389Vill NIHAL KHERA
|
Fazlika
|
|
Work completed
|
26
|
Consultancy for conducting FS & preparing DPR for Abohar Sitoguno Dabwali Road
|
Fazlika
|
0
|
Work Completed
|
27
|
Constn. of bridge 3 span 10.00m each over Defence Drain Xing NH10 Fazilka Sulemanke Border At Km. 419.300
|
Fazlika
|
0
|
March, 2019
|
28
|
Constn. of multiple Box type bridge 2 span 6.00m each over Malout Drain at Km 322.850 of NH 15
|
Fazlika
|
0
|
Work Completed
|
29
|
Raising & Strg. Section Dabwali-Malout Km 326.00 to 327.200 (Proposed Raising due to water logged area )
|
Fazlika
|
1.20
|
Work Completed
|
30
|
Construction of bridge over Sarawan Drain km. 361.900
|
Fazlika
|
|
Work Completed
|
31
|
Section Dabwali-Malout bridge over Wahab Wala Drain at Km 324.400
|
Fazlika
|
---
|
Work Completed
|
32
|
Raising and strengthening in km 372.900 to km 376.240 and in km 382.540 to km 385.190 on Abohar-Usmankheda road section of NH-15 (New NH-62)
|
Fazlika
|
5.99
|
Work Completed
|
33
|
Widn to 4-laning of NH-10 from Km 375.800-382.0000 Passing through (Abohar Town)
|
Fazlika
|
6.20
|
Work Completed
|
34
|
Road Safety improvement including construction of service roads from Km 339.00 to 340.470 on NH-10 (New NH - 09) at Abulkhurana Village
|
Fazlika
|
0.00
|
Work Completed
|
35
|
Improvement of 7 Junctions on Abohar bypass (New NH - 07) to the State of Punjab
|
Fazlika
|
0.00
|
Work Completed
|
36
|
Widening/Upgradation of Abohar-Sito Gunno-Dabwali Road (NH-354E)
|
Fazlika
|
50.89
|
March, 2020
|
37
|
Consultancy Services for Carrying out Road Safety Audits on NH-10 & NH-64A
|
Fazlika & Muktsar
|
0.00
|
Work Completed
|
38
|
Widening/Upgradation of Moga-Kot Ise Khan-Makhu-Harike-Khalra Road (NH-703B)
|
Ferozepur
|
75.167
|
March, 2020
|
39
|
Widening / Upgradation of Makhu-Mallanwala-Ferozepur (upto Arifke) Road Section
|
Ferozepur
|
24.6
|
March, 2020
|
40
|
Construction of ROB in eplacement of existing L Xing No.A-54/E-2 at Km. 198.050 at Ferozepur.
|
Ferozepur
|
|
Work completed
|
41
|
Consultancy for conducting FS & preparing DPR for Harike Mallanwala FZR.on NH 5 Mukatsar Sahib Malout Road on NH 62 & Moga Harike Khalra Road
|
Ferozepur
|
0
|
Work Completed
|
42
|
Re-construction of narrow unsafe bridge over Zira distbutray in Zira town RD. 186.300 (Section Zira to Talwandi Bhai)
|
Ferozepur
|
---
|
Work Completed
|
43
|
ROB at Jalalabad in Km. 61.80 on LC No. C-57
|
Ferozepur
|
0.00
|
July, 2019
|
44
|
4-laning of Harike-Zira-Faridkot section of NH-15 from Km 166.925 to 221.380
|
Ferozepur & Faridkot
|
56.7
|
Work completed
|
45
|
IRQP from Km 158.350 to 166.925 in Harike town (bypassed section)
|
Ferozepur
|
8.575
|
Nov, 2018
|
46
|
IRQP from Km 206.190 to 210.140 in Mudki town (bypassed section)
|
Ferozepur
|
3.95
|
Nov, 2018
|
47
|
IRQP from Km 196.260 to 201.765 in Talwandi Bhai town (bypassed section) including of narrow bridge over Talwandi drain at RD. 198.40
|
Ferozepur
|
5.505
|
Nov, 2018
|
48
|
IRQP from Km 182.40 to 188.260 in Zira town (bypassed section)
|
Ferozepur
|
5.86
|
Nov, 2018
|
49
|
Ramdas To Gurdaspur (Pkg-V) (Bharatmala Project) (PIU-Jalandhar)
|
Gurdaspur
|
47.492
|
LoA on 22.03.2018
|
50
|
Work of service lane 5.5m carrigeway Km. 38.200.-39.600 sec. JAL. HOSP. Manali Road to H.P. Border
|
Hoshiarpur
|
2.80
|
Work completed
|
51
|
Improvement of geometrics including construction of retaining walls, brest walls, drain/cross drainage structures etc from Km 49.200 to 58.850
|
Hoshiarpur
|
|
March, 2019
|
52
|
Widening & stg. Of existing Nakodar Bye Pass from Km. 23.134- 25.765 including Widn. Culvert /minor bridge CWD JULL.
|
Jalandhar
|
2.63
|
Work completed
|
53
|
Providing and fixing of road safety measures on Jalandhar-Kapurthala-Sultanpur Lodhi (Dadwindi) Gidderpindi from Km 4.4 to Km 60.86 on NH-703A
|
Jalandhar
|
-
|
Work completed
|
54
|
widening of existing carriageway from 5.50 m to 10.00 with strengthening Km 38.100 to 48.490 (Km as per existing road) section Sultanpur Lodhi to Gidder Pindi (New NH stretch)
|
Jalandhar
|
-
|
Work completed
|
55
|
Constn. Of propossed Bridge over Sidhwan Drain at km.58.00-58.03 Sec.Shahkot Dharamkot road CWD FZR.
|
Jalandhar
|
-
|
Work completed
|
56
|
Stergthning of Jalandhar-Kapurthala-Sultanpur Lodhi from Km 4.4 to Km 9.00 .
|
Jalandhar
|
4.60
|
Work completed
|
57
|
Widn. To 2 - L with P/S & STG. In Km 62.600-76.150 of NH 703A Jalandhar Kapurthala Makhu road
|
Jalandhar
|
13.975
|
March, 2019
|
58
|
Rehabilitation of ROB at Km 1.23 on Jalandhar-Hoshiarpur road section of NH-70 (New NH-03) under PBF
|
Jalandhar
|
|
Work Completed
|
59
|
Road Safety of Jalandhar-Hoshiarpur road from Km 1.23 to 8.00 section of NH-70 (new NH-03)
|
Jalandhar
|
|
March, 2019
|
60
|
4-laning of Lambra-Shahkot section of NH-71 from Km 11.00 to 44.600
|
Jalandhar
|
33.6
|
Nov, 2018
|
61
|
Widening 2-L with P/S & STG. Km. 48.49-60.86 Sec Sultanpur Lodhi Gidderpindi
|
Jalandhar
|
12.37
|
Work completed
|
62
|
4-laning of Jalandhar-Hoshiarpur upto Himachal Border of NH-70 from Km 11.400 to 49.200 including Hoshiarpur bypass
|
Jalandhar & Hoshiarpur
|
39.125
|
Oct, 2019
|
63
|
4-laning of Shahkot-Moga section of NH-71 from Km 44.600 to 77.200
|
Jalandhar & Moga
|
32.6
|
Nov, 2018
|
64
|
RFP Document for appointment of technical consultant for preparation of feasibility study (FS) and detailed project report (DPR) for newly declared National Highways (NH-703 A, NH-754, NH-154A & NH-703)
|
Jalandhar & Pathankot, Ferozepur
|
0.00
|
Work completed
|
65
|
4-Laning of Phagwara-Rupnagar section of NH-344A from KM 0.00 (design Chainage) to KM 80.820 (Design Chainage) in the state of Punjab on Hybrid Annuity mode.(PIU-Jalandhar)
|
Kapurthala, Nabhashar
|
80.82
|
03.04.2020
|
66
|
Ludhiana-Talwandi Bhai Section of NH-95 on EPC Mode (PIU-Ludhiana)
|
Ludhiana
|
6.02
|
(Completed)
|
67
|
Construction of 4-lane (Partial Access Controlled) Laddowal Bypass from Km. 0.000 to km. 17.041 linking NH-95 with NH-1 via Laddowal seed farm at Ludhiana in the State of Punjab on Hybrid Annuity Mode (PIU-Ludhiana)
|
Ludhiana
|
17.041
|
25.12.2019
|
68
|
Construction of Elevated Corridor partially access controlled highway from Samrala Chowk at Km. 76.000 to Km. 85.980 of NH-95 (Section passing through Ludhiana City) in the State of Punjab on EPC mode (PIU-Ludhiana)
|
Ludhiana
|
12.95
|
07.04.2020
|
69
|
Feasibility study and preparation of DPR of in-principle approved NH (Khanna-Malerkotala-Raikot-Jagraon road,
|
Ludhiana
|
0.00
|
Nov, 2018
|
70
|
4/6 laning of Kharar-Ludhiana Section of NH-95 (New NH-5) from km 10.185 to km 86.199 Samrala Chowk, Ludhiana in the State of Punjab on Hybrid Annuity mode. (PIU-Mohali)
|
Ludhiana, SAS Nagar-Mohali, Ropar, Fateshgarh Sahib
|
76.014
|
14.09.2019
|
71
|
Widening and paved shoulder of Tohana (in Haryana) Punjab/Haryana Border to Moonak-Jakhal-Budhlada-Bhikhi from Km 236.600 to 287.710 of NH-148B
|
Mansa
|
45.888
|
March, 2020
|
72
|
Widening & stg. Of Barnala-Mansa- Sardulgarh road KM.127.00-138.00.CWD BTI.
|
Mansa
|
11.00
|
Work completed
|
73
|
Providing and fixing of road safety measures on Barnala Mansa Sardulgarh Sirsa Road Km 101.00-171.67 CWD BTI.
|
Mansa
|
|
Work completed
|
74
|
Widening 2-L with P/S & STG. Km. 200.95-221.85,227.75-234.62 Sec Barnala Mansa Sardulgarh Sirsa (EPC Mode)
|
Mansa
|
27.77
|
Work completed
|
75
|
Consultancy for preparation of feasibility report and detailed project report for Punjab/Haryana Border to Moonak-Jakhal-Budhlada-Bhikhi from Km 247.150 to 287.710 section of NH-148 B & 20.55 Km portion of Fatehbad-Ratia-Budhlada road falling in State of Punjab which is in-principle NH
|
Mansa
|
|
Nov, 2018
|
76
|
4-laning of Moga -Tallewal section of NH-71 from Km 77.200 to 114.00
|
Moga
|
36.8
|
Nov, 2018
|
77
|
4-laning of Tallewal-Barnala section of NH-71 from Km 114.00 to 136.070 including Barnala bypass Km 136.070 of NH-71 to Km 149.00 of NH-64
|
Moga & Barnala
|
29.64
|
Nov, 2018
|
78
|
Consultancy for preparation of feasibility report and detailed project report for Mudki to Rampura from Km 0.00 to 82.27 section of 254
|
Moga & Ferozepur
|
|
Work Completed
|
79
|
Widening/Upgradation of Mudhki to Jawahar Singh Wala RD. 0.00 to 38.00 section of NH-254
|
Moga & Ferozepur
|
38.00
|
March, 2020
|
80
|
4-laning of existing two lane with paved shoulder road from Talwandi Bhai to Ferozepur NH-05 (Old NH-95) from Km.170.380 to Km.194.040 in the State of EPC mode (PIU-Ludhiana)
|
Moga,Ferozepur
|
24
|
LoA on 28.02.2018
|
81
|
Construction of Fly-over at Derabassi from Km. 29.830 to Km 30.970 of NH-22 (Ambala-Chandigarh Section) on EPC Mode (PIU-Mohali)
|
Mohali
|
Fly over
|
(Completed)
|
82
|
4-laning of Chandigarh- Kharar Section from Sector-39 (Round about) at Chandigarh (km. 0.000) to Kharar (km. 10.185) of NH-21 in the State of Punjab on EPC mode under NHDP Phase V (PIU-Mohali)
|
Mohali
|
10.185
|
08.04.2019
|
83
|
4-laning of Kharar-Kurali Section from km 15.765 to km 29.900 of NH-205 (Old NH-21) including Kurali bypass in the State of Punjab under NHDP Phase-III on EPC mode (PIU-Mohali)
|
Mohali, Ropar
|
14.035
|
15.08.2018
|
84
|
Constn. Of 2 mtr span culvert in Km 358.470 & 360.230 sec Malout Abohar
|
Muktsar
|
0.00
|
Work completed
|
85
|
improvement of Road Safety through improvement of junctions of Gidderbaha-Malout road at Km 313.800 (Bharu Chowk) and at Km 315.650 (Husnar Chowk) in Gidderbaha town on NH-15
|
Muktsar Sahib
|
|
March, 2019
|
86
|
improvement of Road Safety through improvement of junction on NH-10 & NH-15 at Km 348.550 at Malout
|
Muktsar Sahib
|
|
March, 2019
|
87
|
Widening of bridge over Sirhind Feeder Km/RD.333.780 section Lambi - Malout
|
Muktsar Sahib
|
0.00
|
Work completed
|
88
|
Widening of existing carriageway from 7.00 Mtr to 10.00 Mtr with strengthening in Km. 16.580 to Km.44.780 (Section Bathinda to Sri Muktsar Sahib road portion.) NH-754
|
Muktsar Sahib
|
28.2
|
Work Completed
|
89
|
4-laning of Gidderbaha-Malout section of NH-15 from Km 330.00 to 331.00 (Malout Town)
|
Muktsar Sahib
|
1.00
|
Work Completed
|
90
|
Widening Of existing carriageway from 5.50-7.00 m along with stg. Km 29.660-62.847 of Kotkapura -sri Mukatsar Sahib -Jalalabad road CWD FZR.
|
Muktsar Sahib & Ferozepur
|
27.28
|
Work completed
|
91
|
Four lanning in KM 0.150-5.50 of Section Pathankot-Mamoon Chowk
|
Pathankot
|
5.36
|
Work completed
|
92
|
special repair of southern bypass Patiala constructed and Handed over by BRO to State PWD B&R "Restoration of Damages and rectification of depression in the pavement surface on approaches to structures to make it traffic worthy" (Non Bituminous items of work inc. road safety measures
|
Patiala
|
18.60
|
Work completed
|
93
|
4-laning of Patiala Bypass on EPC mode
|
Patiala
|
19.28
|
Work completed
|
94
|
4-laning of Rajpura-Patiala section of NH-64 from Km 28.100 to 50.00
|
Patiala
|
21.9
|
Work completed
|
95
|
4-laning of Patiala Bypass to start of Sangrur Bypass section of NH-64 from Km 64.570 to 106.170
|
Patiala & Sangrur
|
41.47
|
Work completed
|
96
|
ROB at Nangal in Km. 63.00 on LC No. 92-C
|
Roopnagar
|
0.00
|
June, 2020
|
97
|
ROB at Nangal in Km. 59.870 on LC No. 88-C
|
Roopnagar
|
0.00
|
June, 2020
|
98
|
Consultancy for conducting FS & preparing DPR for NH 344Ai.e. Banga Garhshankar Anandpur Sahib Naina devi Road
|
Roopnagar & SBS Nagar
|
0
|
Dec, 2018
|
99
|
Consultancy for conducting FS & preparing DPR for NH 5 Near Prem Nagar Bassi Pathana Fatehgarg Sahib Patiala Byepass Road
|
Roopnagar, Fatehgarh Shaib & Patiala
|
0
|
Dec, 2018
|
100
|
Strengthening/IRQP of Road Portion Km 179.495 to 181.805= 2.31km of Sangrur-Patran-Khanauri Road NH-71(52) Internal City portion Sangrur not falling under NHDP-IV Scheme
|
Sangrur
|
2.31
|
Nov, 2018
|
101
|
ROB at Barnala in Km.140.650 on LC No. B-92/A-2
|
Sangrur
|
0.00
|
Nov, 2018
|
102
|
4-laning of Sangrur to Dogal Kalan section of NH-71 from Km 181.805 to Km 211.390
|
Sangrur
|
29.585
|
Work completed
|
103
|
4-laning of Dogal Kalan to Punjab/ Haryana border section of NH-71 from Km 211.390 to Km 238.695
|
Sangrur
|
27.305
|
Work completed
|
104
|
4-laning of Sangrur and Dhanauala Bypass
|
Sangrur
|
18.24
|
Work completed
|
105
|
4-laning of end of Sangrur Bypass to Tapa from Km 116.950 to 138.030 & Km142.950 to 168.00
|
Sangrur & Bathinda
|
46.04
|
Work completed
|
106
|
Strengthening/IRQP of road portion km 227.800 to 232.660= 4.86 Km of Sangrur-Patran-Khanauri Road upto Punjab/Haryana border
|
Sangrur
|
4.86
|
Nov, 2018
|
107
|
Stg. Of ROB. Kurali Toll Plaza Km.25.54-27.50 on chd.-Ropar rd. CWD ROPAR.
|
SAS Nagar
|
1.96
|
Work completed
|
108
|
Providing and fixing of road safety measures on Ambala-Naraingarh road from Km 9.23-13.75 on NH-72(1520
|
SAS Nagar
|
-
|
Work completed
|
109
|
Providing and fixing of road safety measures on Chandigarh-Ropar road from Km 0.871-1.68 &KM 6.80-15.40 .
|
SAS Nagar
|
-
|
Work completed
|
110
|
Consultancy for conducting FS & preparing DPR for newly declared NH 205A i.e. Kharar Banur Tepla Road
|
SAS Nagar
|
0
|
Work Completed
|
111
|
4-laning of Zirakpur-Rajpura section of NH-64 from Km 0.00 to 28.100
|
SAS Nagar & Patiala
|
28.1
|
Work completed
|
112
|
Providing and fixing of road safety measures on Chandigarh-Ludhiana road from Km 0.00-10.400 & KM 17.125-31.200.
|
SAS Nagar & Roopnagar
|
-
|
Work completed
|
113
|
Road Safety in Km 81.9 to Km 88.00 on NH-344A
|
SBS Nagar
|
0.00
|
Work completed
|
114
|
Khemkaran – To start to Amritsar Bypass (Pkg-II) (Bharatmala Project) (PIU-Jalandhar)
|
Tarn- Taran
|
48.823
|
LoA on 19.03.2018
|
115
|
4-laning of Harike Bypass section of NH-15 from Km 158.350 to 166.925
|
Trantaran
|
9.9
|
Work completed
|