- Production of Crude Oil
Crude oil production[1] during February,2021 was2322.32 TMT which is6.89% lower than target and3.22% lower when compared with February, 2020.Cumulative crude oil production during April-February, 2020-21 was 27878.81 TMT which is 5.65% and 5.41% lower than target for the period and production during corresponding period of last yearrespectively. Unit-wise and State-wise crude oil production is given at Annexure-I. Unit-wise crude oil production for the month of February, 2021 and cumulatively for the period April-February, 2020-21 vis-à-vis same period of last year has been shown in Table-1 and month-wise in Figure-1.
Table-1: Crude Oil Production (in TMT)
Oil Company
|
Target
|
February (Month)
|
April-February (Cumulative)
|
2020-21 (Apr-Mar)
|
2020-21
|
2019-20
|
% over last year
|
2020-21
|
2019-20
|
% over last year
|
Target
|
Prod.*
|
Prod.
|
Target
|
Prod.*
|
Prod.
|
ONGC
|
20931.68
|
1579.89
|
1544.84
|
1672.97
|
92.34
|
19163.56
|
18469.67
|
18848.85
|
97.99
|
OIL
|
3121.00
|
244.98
|
218.49
|
240.26
|
90.94
|
2848.51
|
2687.75
|
2852.55
|
94.22
|
PSC Fields
|
8265.00
|
669.28
|
559.00
|
486.33
|
114.94
|
7536.85
|
6721.39
|
7770.91
|
86.49
|
Total
|
32317.68
|
2494.14
|
2322.32
|
2399.55
|
96.78
|
29548.91
|
27878.81
|
29472.31
|
94.59
|
Note: Totals may not tally due to rounding off. *: Provisional
Figure-1: Monthly Crude Oil Production
Unit-wise production details with reasons for shortfall are as under:
-
- Crude oil production by ONGC(Oil and Natural Gas Corporation) in nomination block during February, 2021 was 1544.84TMT which is 2.22%lower than target and7.66%lower when compared with February 2020. Cumulative crude oil production by ONGC during April-February, 2020-21 was 18469.67 TMT which is 3.62%and 2.01% lower than target for the period andproduction during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Production planned from WO-16 cluster could not be realized due to delay in MOPU (Sagar Samrat) as activities at GPC yard Abu Dhabi got affected due to COVID-19 restrictions / lockdown.
- Production planned from new wells in Ratna field affected due to non- availability of ESPs (Electrical submersible pump) due to implications of COVID-19. Presently rigs are deployed at two well platforms and wells are being completed with ESPs.
- New wells planned under Cluster-8 development project delayed due to delay in installation of new platforms due to COVID implications.
-
- Crude oil production by OIL(Oil India Ltd) in the nominationblock during February, 2021 was218.49 TMT which is 10.81% % lower than target and 9.06% lower when compared with February 2020. Cumulative crude oil production by OIL during April-February, 2020-21 was 2687.75 TMT which is 5.64% and 5.78% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Less than planned contribution from workover wells, drilling wells and old wells.
- Bandhs /blockade by local people and associations after the Baghjan Blowout.
-
- Crude oil production by Pvt/JVscompanies in the PSC (Production Sharing Contract) regime during February, 2021 was 559.00 TMT which ishigher 14.94% when compared to the February,2020 but 16.48% lower than the monthly target.Cumulative crude oil production by Pvt/JVs companies during April-February, 2021 was 6721.39 TMT which is 10.82% and 13.51% lower than target for the period and production during corresponding period of last year respectively.Reasons for shortfall in production are as under:
- RJ-ON-90/1 (Cairn Energy India Ltd): Delayed start up full field polymer injection in Bhagyam and Aishwarya field. Delay in hook-up of Stage-2 wells and NA-1 processing facility commissioning in advance stage in ABH. Flow cease in few wells of Satellite fields. Project schedule of well and surface facility of Tukaram, Kaam-1 and GSV condensate is impacted by COVID-19.
- RAVVA (Cairn Energy India Ltd): Decline in production from producer wells
- B-80 (Hindustan Oil Exploration Company Ltd): Production from B80 field not commenced due to delay in completion of field development activities because of COVID
- PY-3 (HARDY): Production could not be commenced in PY-3 field.
- Production of Natural Gas
Natural gas production during February,2021 was 2307.12MMSCM which is 19.31% lower than the monthly target and 1.43% lower when compared with February, 2020. Cumulative natural gas production during April-February, 2020-21 was 25986.70MMSCM which is 14.54% and 9.67% lower than target for the period and production during corresponding period of last year respectively. Unit-wise and state-wise natural gas production is given at Annexure-II. Unit-wise natural gas production for the month of February, 2021 and cumulatively for the period April-February, 2020-21 vis-à-vis same period of last year has been shown in Table-2 and month-wise in Figure-2.
Table-2: Natural Gas Production (inMMSCM)
Oil Company
|
Target
|
February (Month)
|
April-February (Cumulative)
|
2020-21 (Apr-Mar)
|
2020-21
|
2019-20
|
% over last year
|
2020-21
|
2019-20
|
% over last year
|
Target
|
Prod.*
|
Prod.
|
Target
|
Prod.*
|
Prod.
|
ONGC
|
23982.98
|
1852.25
|
1630.20
|
1869.97
|
87.18
|
21932.99
|
20040.20
|
21840.67
|
91.76
|
OIL
|
2761.73
|
238.14
|
187.88
|
200.79
|
93.57
|
2500.26
|
2269.64
|
2456.64
|
92.39
|
PSC Fields
|
6826.82
|
768.79
|
489.04
|
269.76
|
181.29
|
5976.55
|
3676.86
|
4471.49
|
82.23
|
Total
|
33571.53
|
2859.18
|
2307.12
|
2340.52
|
98.57
|
30409.81
|
25986.70
|
28768.80
|
90.33
|
Note: Totals may not tally due to rounding off. *: Provisional
Figure-2: Monthly Natural Gas Production
-
- Natural gas production by ONGC in the nominationblocks during February, 2021 was 1630.20MMSCM which is 11.99% lower than target and 12.82% lower when compared with February 2020. Cumulative natural gas production by ONGC duringApril-February, 2020-21 was 20040.20 MMSCM which is 8.63% and 8.24% lower than target for the period and production during corresponding period of last year respectively.Reasons for shortfall in production are as under:
- Less Gas production from WO16 cluster due to delay in MOPU.
- Less than planned production from Vasistha / S1 wells in Eastern Offshore Assets (EOA) due certain reservoir related issues.
- Less gas intake by Uran Plant for maintenance jobs and less Offtake by consumers.
-
- Natural gas production by OILin the nomination block during February, 2021 was 187.88 MMSCM which is 21.11% lower than monthly target and 6.43% lower than the February, 2020. Cumulative natural gas production by OIL during April-February, 2020-21 was 2269.64 MMSCM which is 9.22% and 7.61% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Low upliftment/demand of gas by the major customers.
- Bandhs /blockade by local people and associations after the Baghjan Blowout.
-
- Natural gas production by Pvt/JVs companiesin the PSC (production sharing contracts) regime during February,2021 was 489.04MMSCM which is 81.29% higher than the February, 2020 but 36.39% lowerthan monthly target. Cumulative natural gas production by Pvt/JVs during April-February, 2020-21 was 3676.86MMSCM which is 38.48% and 17.77% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- RJ-ON/6 (Focus Energy Limited): Reduced Gas offtake by buyer.
- KG-DWN-98/2 (Oil & Natural Gas Corpn.): U3-B well is flowing less than the expected profile and delay in commissioning of Wells of U1-field.
- KG-OSN-2001/3 (Oil & Natural Gas Corpn.): Well D-7 is under completion and Testing.
- Raniganj East (Essar Oil and Gas Exploration & Production Ltd): Production is lower due to less sales off-take.
- RJ-ON/6 (Focus Energy Limited): Production is lower due to less sales off-take.
- Crude Oil Processed (Crude Throughput)
Crude Oil Processed during February, 2021 was 18617.41 TMT which is 7.60% lower than the target for the monthand 11.84% lower than February, 2020.Cumulative crude throughput during April-February, 2020-21 was200787.90 TMT which is 12.72% and 13.89% lower than target for the period and crude throughput during corresponding period of last year respectively. Refinery-wise details of the crude throughput and capacity utilization during the month of February, 2021 vis-à-vis February, 2020 are given at Annexure-III and Annexure-IV. Company-wise crude throughput for the month of February, 2021 and cumulatively for the period April-February, 2020-21vis-à-vis same period of last year has been shown in Table-3 and month-wise in Figure-3.
Table 3: Crude Oil Processed (Crude Throughput) (in TMT)
Oil Company
|
Target
|
February (Month)
|
April-February (Cumulative)
|
2020-21 (Apr-Mar)
|
2020-21
|
2019-20
|
% over last year
|
2020-21
|
2019-20
|
% over last year
|
Target
|
Prod.*
|
Prod.
|
Target
|
Prod.*
|
Prod.
|
CPSE
|
147377.43
|
11566.49
|
11729.41
|
12168.69
|
96.39
|
134436.88
|
114662.11
|
132454.12
|
86.57
|
IOCL
|
72400.04
|
5259.27
|
5387.06
|
5724.23
|
94.11
|
65846.41
|
56423.74
|
63683.24
|
88.60
|
BPCL
|
33000.00
|
2549.00
|
2674.16
|
2659.50
|
100.55
|
30149.00
|
23462.58
|
28825.59
|
81.39
|
HPCL
|
16999.28
|
1415.75
|
1378.92
|
1515.18
|
91.01
|
16057.23
|
14843.56
|
15665.44
|
94.75
|
CPCL
|
10290.00
|
840.00
|
757.60
|
735.33
|
103.03
|
9370.00
|
7279.35
|
9307.45
|
78.21
|
NRL
|
2549.86
|
197.15
|
227.10
|
224.69
|
101.07
|
2331.59
|
2466.45
|
2135.69
|
115.49
|
MRPL
|
12074.42
|
1300.00
|
1297.36
|
1304.21
|
99.47
|
10624.42
|
10113.15
|
12756.43
|
79.28
|
ONGC
|
63.83
|
5.32
|
7.21
|
5.55
|
129.97
|
58.23
|
73.27
|
80.29
|
91.25
|
JVs
|
14772.00
|
1313.00
|
614.84
|
1680.43
|
36.59
|
13344.00
|
14634.45
|
18456.91
|
79.29
|
BORL
|
7800.00
|
620.00
|
601.47
|
652.22
|
92.22
|
7140.00
|
5587.50
|
7179.70
|
77.82
|
HMEL
|
6972.00
|
693.00
|
13.37
|
1028.21
|
1.30
|
6204.00
|
9046.95
|
11277.21
|
80.22
|
Private
|
89515.16
|
7269.05
|
6273.16
|
7269.05
|
86.30
|
82271.22
|
71491.35
|
82271.22
|
86.90
|
RIL
|
68894.99
|
5667.78
|
4876.36
|
5667.78
|
86.04
|
63370.05
|
56051.02
|
63370.05
|
88.45
|
NEL
|
20620.18
|
1601.27
|
1396.79
|
1601.27
|
87.23
|
18901.17
|
15440.33
|
18901.17
|
81.69
|
TOTAL
|
251664.61
|
20148.54
|
18617.41
|
21118.16
|
88.16
|
230052.09
|
200787.90
|
233182.24
|
86.11
|
Note: Totals may not tally due to rounding off. *: Provisional
Figure 3: Crude Oil Processed (Crude Throughput)
3.1 CPSE Refineries’ crude oil processed during February, 2021 was 11729.41TMT which is 1.41% higher than the target for the month but 3.61% lower when compared with February, 2020.Cumulative crude throughputby CPSE refineries during April-February, 2020-21 was 114662.11TMT which is 14.71% and 13.43% lower than target for the period and crude throughputduring corresponding period of last year respectively.Reasons for shortfall in production are as under:
- IOCL-Digboi: Crude processed lower due maintenance and installation shutdown.
- IOCL-Barauni: Crude processed lower due to lower product upliftment.
- IOCL-Bongaigaon: Crude processed lower due to as per crude availability.
- HPCL-Mumbai: Crude processed lower due to planned shutdown of secondary units.
- HPCL-Visakh: Crude processed lower due to unplanned shutdown of primary and secondary units.
3.2 JV refineries’ crude oil processed during February, 2021 was 614.84TMT which is 53.17% lower than the target for the month and 63.41% lower when compared with February, 2020. Cumulative crude throughput during April-February, 2020-21 was14634.45TMT which is 9.67% higher than target for the period but20.71% lower when compare with the corresponding period of last year respectively.Reasons for shortfall in production are as under:
- BORL-Bina: Crude processed lower due to lower demand of petroleum products amid ongoing COVID-19 pandemic.
- HMEL-Bhatinda: Crude processed lower dueto refinery planned shutdown during the month.
3.3 Private refineries’ crude oil processed during February, 2021 was 6273.16TMT which is 13.70% lower than the corresponding month of last year. Cumulative crude throughputduring April-February, 2020-21 was 71491.35 TMT which is 13.10% lower than thecorresponding period of last year.
- Production of Petroleum Products
Production of Petroleum Products during February, 2021 was 19439.03 TMT which is 5.86% lower than the target for the month and 10.92% lower when compared with February, 2020. Cumulative production during April-February, 2020-21 was 210683.03 TMT which is 10.83% and 12.23% lower than target for the period and production during corresponding period of last year respectively. Unit-wise production of petroleum products is given at Annexure-V. Company-wise production for the month of February, 2021 and cumulatively for the period April-February, 2020-21 vis-à-Vis same period of last year has been shown in Table-4 and month-wise in Figure-4.
Figure 4: Monthly Refinery Production of Petroleum Products
Table 4: Production of Petroleum Products (TMT)
Oil Company
|
Target
|
January (Month)
|
April-January (Cumulative)
|
2020-21 (Apr-Mar)
|
2020-21
|
2019-20
|
% over last year
|
2020-21
|
2019-20
|
% over last year
|
Target
|
Prod.*
|
Prod.
|
Target
|
Prod.*
|
Prod.
|
CPSE
|
138753.95
|
10926.31
|
11115.64
|
11691.12
|
95.08
|
126599.88
|
108596.68
|
125255.46
|
86.70
|
IOCL
|
68760.50
|
5009.75
|
5134.48
|
5662.47
|
90.68
|
62520.65
|
54182.96
|
60940.73
|
88.91
|
BPCL
|
31319.00
|
2433.00
|
2545.79
|
2543.13
|
100.10
|
28633.00
|
22381.77
|
27539.65
|
81.27
|
HPCL
|
15914.53
|
1343.13
|
1316.68
|
1418.10
|
92.85
|
15045.41
|
13897.01
|
14568.11
|
95.39
|
CPCL
|
9527.02
|
781.64
|
717.04
|
686.72
|
104.42
|
8671.74
|
6672.73
|
8534.03
|
78.19
|
NRL
|
2554.46
|
199.72
|
222.32
|
217.37
|
102.28
|
2332.36
|
2489.99
|
2050.40
|
121.44
|
MRPL
|
10618.44
|
1154.06
|
1172.80
|
1158.20
|
101.26
|
9341.99
|
8902.39
|
11548.59
|
77.09
|
ONGC
|
60.00
|
5.01
|
6.53
|
5.14
|
127.06
|
54.73
|
69.82
|
73.95
|
94.42
|
JVs
|
13590.40
|
1213.36
|
560.11
|
1534.63
|
36.50
|
12271.92
|
13562.22
|
17208.82
|
78.81
|
BORL
|
6958.40
|
553.36
|
541.06
|
601.74
|
89.92
|
6369.92
|
4909.48
|
6560.55
|
74.83
|
HMEL
|
6632.00
|
660.00
|
19.05
|
932.89
|
2.04
|
5902.00
|
8652.75
|
10648.27
|
81.26
|
Private
|
102154.50
|
8211.58
|
7459.64
|
8211.58
|
90.84
|
93205.01
|
84669.54
|
93205.01
|
90.84
|
RIL
|
82374.12
|
6677.60
|
6100.06
|
6677.60
|
91.35
|
75071.58
|
69702.65
|
75071.58
|
92.85
|
NEL
|
19780.38
|
1533.98
|
1359.58
|
1533.98
|
88.63
|
18133.42
|
14966.89
|
18133.42
|
82.54
|
Total Refinery
|
254498.86
|
20351.24
|
19135.38
|
21437.32
|
89.26
|
232076.81
|
206828.44
|
235669.28
|
87.76
|
Fractionators
|
4523.28
|
298.37
|
303.64
|
384.15
|
79.04
|
4193.95
|
3854.59
|
4369.95
|
88.21
|
TOTAL
|
259022.13
|
20649.61
|
19439.03
|
21821.48
|
89.08
|
236270.76
|
210683.03
|
240039.24
|
87.77
|
Note: Totals may not tally due to rounding off. *: Provisional
-
- Production of petroleum Products by Oil’s Refineries during February, 2021 was 19135.38 TMT which is 5.97% lower than the target for the month and 10.74% lower when compared with February, 2020. Cumulative production of petroleum products by refineries during April-February, 2020-21 was 206828.44 TMT which is 10.88% and 12.24% lower than target for the period and production during corresponding period of last year respectively.
-
- Production of petroleum Products by Fractionators during February, 2021 was 303.64 TMT which is 1.77% higher than the target for the month but 20.96% lower when compared with February, 2020. Cumulative production by Fractionators during April-February, 2020-21 was 3854.59 TMT which is 8.09% and 11.79% lower than target for the period and production during corresponding period of last year respectively.
Click here to see Annexure I
Click here to see Annexure II
Click here to see Annexure III
Click here to see Annexure IV
Click here to see Annexure V
********
YB/SK
(Release ID: 1706110)
Visitor Counter : 812
Read this release in:
Hindi