User fee collection at fee plazas on National Highways has improved considerably upon implementation of FASTag Programme in the country.  The FASTag Collection on fee plazas of National Highways on 29.04.2023 was Rs 162.10 Crore.

User fee collection through Fastag in past three months for plazas entrusted to National Highways Authority of India is as under:

Month

FASTag Collection

(in Crore Rupees)

April, 2023

4,314

May, 2023

4,554

June, 2023

4,349

 

Average Monthly Fee Collection through FASTags for the Quarter April to June, 2023

Rs. 4,406 Cr.

Average Monthly Fee Collection through FASTags for previous Quarter (January-March, 2023)

Rs. 4,083 Cr.

Average Monthly Fee Collection through FASTags for Previous Years 2022-23

Rs. 3,841 Cr.

 

There is increasing trend in average monthly fee collection through FASTags.

Total number of fee plazas started in Financial Year 2022-23 is 112 under National Highways Authority of India. The details of fee plazas is at Annexure A.

Fee plazas are constructed during the execution of project and put to commercial use after issuance of Provision Completion Certificate.

Government has appointed a consultant to provide advisory services on implementation of new technologies like Global Navigation Satellite System (GNSS) based barrier less free flow tolling.

Global Navigation Satellite System (GNSS) has the capacity to retrieve the positioning of the vehicle on the National Highway and calculates the user fee based upon the distance travelled.

ANNEXURE A

Details of fee plazas that are likely to be installed at National Highways, state-wise:

 

New fee Plazas added in Financial Year 2022-23

S.No

Regional office

Section and Tollable reach

Location and name of the plaza

plaza added

1

Ro, Lucknow (west UP)

Puranpur-Khutar Section

Km 38.00 - Km 82.00

At Km 69.640 Hitouta in Shahjahanpur dist. on dated 19.04.2022

1

2

Ro, Lucknow

(West UP)

Pilibhit - Puranpur

KM 0.000 - Km 38.000

At Km 9.590 Sarai Sundar Pur on dated 20.04.2022

1

3

RO, Odisha

Rimuli - Koida section

Km 163.000 - Km 206.200

At Km 176.060 Kandra on dated 03.04.2022

1

 

4

 

RO, Jaipur

Sanchore - Dhanera - Deesa Section Km 0.00 to Km 33.600 (existing km 0.00 to km 33.600)

At Km 8.400 Choti Villor 21.04.2022

 

1

5

RO, Jaipur

Raisinghnagar to Poogal Section from design kilometer 101.000 to kilometer 263.460

at km 102.500 Thakri (Raisingh nagar) 1.12.2021

1

6

RO, Jaipur

At km 163.000 Patroda 01.12.2021

1

 

7

 

RO, Vijaywada

Rapthadu-Bathalapalli section

Km 76.000 - Km 99.971 (4LPS) and Km 99.971 - Km 134.000 (2LPS)

Bathalapalli Km 104.405 16.07.2021

 

1

8

RO, Hyderabad

Nakrekal-Tanamcherla

Kothagudem Km 42.950

03.01.2022

1

 

9

 

RO, Bhopal

Pachore-Shujalpur

Km 2.700 - Km 33.000

(existing 2.900 - Km 33.200)

Talen (Mirzapur) Km 14.600 30.05.2022

 

1

10

RO UP East

Indo Nepal Border - Rudahuali

Km 0.000 - Km 65.870

Belgada at Km 53.630

01.04.2022

1

11

RO Bangalore

Bellary Byrapura section (HAM)

Km 253.600 - km 308.550

Jajirakallu at Km 281.430

04.05.2022

1

12

RO-Bhopal

PIU jabalpur

Hiran River to Sindoor River Km 66.00 to 130.00

Sarasdol

15.06.2022

1

13

Mumbai

Nashik-PIU

Nashik-Peth

Km 11.600-Km 65.115

Chachadgaon Km 32.450 22.06.2022

1

14

RO Jaipur

 

Bar-Bilara-Jodhpur

Km 0.000 - Km 109.655

Biratiya

10.05.2022

1

15

RO Jaipur

Binaswas

10.05.2022

1

16

RO Jaipur

Darah-Jhalawar-Teendhar

Km 9.860 - km 58.740

Beer Mandi

08.06.2022

1

 

17

Hyderabad Sangareddy-PIU

Ramsanpalle to Mangloor Section design Km 39.980 to Km 86.788 (existing Km 44.757 to km 91.350

Kollapalli 28.05.2022

 

1

18

TN

Villupuram

Kallagam-Meensurutti

Km 38.700 - Km 98.433

Managethi

27.05.2022

1

19

TN-Chennai

Karaikudi

Karaikudi - Ramanathapuram Section design km.000 to km 173.500 (existing km 94.000 to km 174.000)

Kodikottai at Km 114.550

10.06.2022

1

 

20

TN-Chennai Karaikudi

Vennathur at Km 154.960

10.06.2022

 

1

21

Punjab

Khemkaran Town - Amritsar Bypass

Km 22.673 - Km 71.496

Mannan

27.05.2022

1

22

AP

Palamaneru-Krishnagiri

Km 58.600 - Km 140.040

Danamaiahgaari palli Toll Plaza

02.04.2022

1

23

AP

Madanapalli-Punganuru-Palamaneru

Km 244.930 - Km 299.775

Bandlapalli Toll Plaza

11.05.2022

1

24

Mah-Solapur

 

Solapur - Bijapur Section Km 0.000 - Km 110.542

Nandani at Km 32.100 30.12.2021

1

25

Mah-Solapur

Tidagundi at km 85.950 30.12.2021

1

 

26

 

Keral-Palakkad

Vadakkancherry to Thrissur Border Km 240.000 - Km 270.000

(design Km 236.135 - Km 264.490)

Panniyankara at Km 243 09.03.2022

 

1

27

Ranchi-

Govindpur-(Rajganj)-Chas-West Bengal Border section design Km 0.000 - Km 37.750 (existing Km 0.530 - Km 51.490)

Pupunki at km 26.100

1

 

28

 

Nagpur Washim-PIU

Medeshi-Washim-Sawarkheda hingloli existing km 63.600 to km 132.760 (design kilometer 60.725 to kilometer 128.200)

Dhumka Tondgaon at km 91.525 01.07.2022

 

1

29

Raipur - Bilaspur

Bilaspur - Pathrapali Km 0.000 - Km 53.300

Limha 14.07.2022

1

30

Raipur - Raipur

MP border Chilpi - Kawardha (Pkg-I) Km 191.422 - Km 242.3

Mudiyapara 29.07.2022

1

 

31

 

Nagpur-Nagpur-2

Nagpur-Umred Section Km 7.300 - Km 48.400

(existing km 7.300 - Km 48.575)

 

Champa at Km 27.225

 

1

32

Chennai - Salem

Cuddalore - Vridhachalam Km 0.800 to Km 51.000

Upoonalagaram 20.08.2022

1

33

Ranchi-Jamshedpur

Ranchi - Mahulia

Km 217.300 - Km 233.350

Pata 20.08.2022

1

34

RO Chennai -

Villupuram

 

Vellore connecting Tiruvannamalai and terminating at Villupuram Section Km 81.000 - km 202.600

Vallam

20.08.2022

1

35

RO Chennai-Villupuram

Enamakariyandal

20.08.2022

1

36

RO Chennai - Villupuram

Thennamdevi

20.08.2022

1

37

Mumbai-Solapur

 

Sangli - Solapur (Pkg-I) Km 182.195 - Km 378.100 (HAM)

Ankadhal km 274.800

12.08.2022

1

38

Mumbai-Solapur

Ichgaon km 343.510

22.08.2022

1

39

Mumbai- Kolhapur

Borgaon Km 222.200

18.08.2022

1

 

40

Vijayvada- Anantpur

Kodikonda Junction to Madakasira section design kilometer 0.000 to kilometer 56.803 (existing km 0.00 to km 59.100)

Cholasamundram at Km 19.440 30.08.2022

 

1

41

 

 

 

 

 

RO Delhi- Bhiwani

 

 

 

 

Ismailabad-Ghangeri (Trans Haryana) (starting from 0.000

Km at Ismailabad (Gangheri) and ending at Km 227.020 at Narnaul bypass) (01.08.2022)

Chandlana Toll Plaza

1

42

Mohna Toll Plaza

1

43

Kheri Sharaf Ali Toll Plaza

1

44

Bahri Toll Plaza

1

45

Amrawali Khera Toll Plaza

1

46

Kilazafargarh Toll Plaza

1

47

Bainsi Toll Plaza

1

48

Kharkhara Toll Plaza

1

49

Kherari Toll Plaza

1

50

Dadri Toll Plaza

1

51

Buchawas Toll Plaza

1

52

Jat Guwana Toll Plaza

1

53

Pabanawa Toll Plaza

1

54

RO Chennai -Villupuram

Trichy-Kallagam

Km 0.000 - Km 38.700

Kallakudi @ 32.955

03.06.2022

1

 

55

RO Chandigarh- Sonipat

Rai Malikpur (Rajasthan / Haryana border) – Narnaul- Mohindergarh- Charkhi Dadri-Bhiwani – Kharak) Section

Bamla 05.08.2022

 

1

 

56

 

RO-Nagpur

Manjarsumba-Chumbaliphata Km 137.300 - Km 169.472

Vaidyakinhi at Km 154.400 22.10.2022

 

1

 

57

 

PIU Gwalior

Mihona to Lahor to Daboh to Bhander to UP Border Section

Goragaon 04.10.2022

 

1

58

RO Varanasi - PIU Raebareli

Kalupur-Lalata Road Section

Jorwara 08.10.2022

1

59

RO Lucknow - PIU Bagphat

Meerut to Haryana Border via Baghpat Section

Baleni 19.10.2022

1

 

60

 

Jaipur-Jaipur

Jhadol-Ambhabelly section Km 43.900 to Km 91.000 (esisting Km 51.515 to Km 2.690 of (VR)

Karel 17.10.2022

 

1

61

Jaipur-Jaipur

Alwar to Nuh Section Km 92.400 to Km 127.350 (existing Km 92.400 to Km 127.350)

Bahala 10.10.2022

1

 

62

Gandhinagar- Gandhinagar

Dwarka-Connecting Khambaliya, Jam Nagar, Dhrol, Amran Terminating at its Junction at NH-27 near Maliya

Dharampur 25.10.2022

 

1

 

63

RO Madurai - PIU Nagarcoil

Nagercoil to Kavalkinaru Section from km.0.000 to km.16.376

Thirupathisaram Toll Plaza at Km.2.420 06.10.2022

 

1

 

64

RO Hyderabad - Khammam

Suryapet (Design Ch.0+420/Existing Km. 128+500 of NH-65) to Khammam Design Ch.59+046/Existing  Km.50+750 of old SH-42

Singarenipalli fee plaza at Km. 37.400 21.10.2022

 

1

 

 

65

 

RO Madurai - PIU Dindigul

Dindigul Theni - Kumili Section from design Km 2.750 to Km 136.543

[(existing Km 2.750 to Km 73.400 of NH 45E and existing Km 215.500 to Km 273.600 of NH 220)]

 

Upparpatti 01.10.2022

 

1

 

66

Ranchi- Jamshedpur

Jamshedpur-Mahulia Section from km.233.350 to km.277.500

Putru fee plaza at Km.274.500 22.11.2022

 

1

 

67

 

Odisha-Rourkela

Design Km.216.200 to Km.237.100 of Biramitrapur –

Brahmani Bypass end section and Design km 0.100 to km

3.300 of Brahmani Bypass and from Design km 240.350 to km

287.200 of Brahmani Bypass to Rajamunda Section

Darjing Fee Plaza at Km 280.215 27.11.2022

 

1

68

RO Varanasi - PIU

Mirzapur

Varanasi-Hanumana Section from Design Km 15.100 to Km 140.220

Pratappur

04.11.2022

1

69

Ro Jabalpur

PIU Jabalpur

Rewa to Sirmour Section from Design Km 0.000 to Km 36.710

Palhan

02.12.2022

1

 

70

 

RO Varanasi - PIU Mirzapur

Sultanpur- Varanasi section from design kilometer 209.230 to kilometer 272.590 (existing km 205.000 to km 263.000)

 

Hauj 12.12.2022

 

 

1

71

RO hyderabad-

PIU Mancherial

Mancherial to Repellewada Section from Design kilometer 0.000 to kilometer 42.000 (existing km. 251.900 to km. 288.510)-Partial length

Mandamarri at Km.21.470

30.12.2022

1

 

72

 

PIU Raebarelli

Raebareli to Allahabad (Prayagraj) NHDP-IVA

From 82.700 to km 188.600 (design Ch 0.700 - 106.517)

Itora Buzurg @ 25.315 22.12.2021

 

1

73

RO Ranchi - PIU Ranchi

Ranchi Piska - Bijupura

Km 3.600 - Km 55.000

Hesmi (Mandar) @ 29.375 (ealier Murma)

22.03.2022

1

 

74

 

RO Raipur - PIU Bilaspur

Vill Theka / Darrighat - Vill Banari Section Exicting Ch. 127.500 - Km 178.944

(De. Ch. 127.500 - 160.687)

Paraghat @ km 138.500

18.06.2021

 

1

75

 

 

 

 

 

RO Delhi -Piu Ghaziabad

 

 

 

 

Delhi-Meerut Expressway from design Km 0.000 to Km 59.777

(Stretch already added only 1 plaza added instead of 07 location of plaza)

Sarai Kale

Khan (Delhi) at Km 1500

1

76

Indirapuram (near Ghaziabad) at Km 9.500

1

77

Dundahera (near Ghaziabad) at Km 19.900

1

78

Dasna (near Ghaziabad) at Km 27.360)

1

79

At Km 31.343 near Rasoolpur Sikrod village in Ghaziabad

1

80

At Km/Ch. 45.706 near Bhojpur village Ghaziabad

1

81

Ro Kolkata-Malda

Raiganj-Dalkhola section including Dalkhola Bypass in the State of West Bengal from Design km 397+680 to km 452.050 of NH-34

Barai at Km 411.850

28.01.2023

1

82

 

RO Chandigarh-Amritsar

2Lof Moga to Makhu from km. 0.000 to km 33.611 & Harike to Khalra from km 44.680 to km 86.236

Bhagupur (km.57.800) 16.01.2023

 

1

 

83

 

Ro Chandigarh-Ludhiana

Rehabilitation and upgradation of two lanes with paved shoulder from Moga (Design Ch. 0+000) to Makhu (Design Ch. 33+611) of NH-703B in the State of Punjab on EPC Mode

Karahewala at km. 25.295 14.01.2023

 

1

 

 

84

 

 

RO-Vijaywada - Vijaywada PIU

Rehabilitation and Upgradation of Losari - Machavaram section from Km 34/230 (Design Km. 32/900) to Km 84/550 (Design Km. 82.259) of NH-214 A (New NH – 216 ) to two lane with paved shoulder in the state of Andhra Pradesh under NHDP-IV on EPC Mode

 

Munjuluru Km. 66.700

25.01.2023

 

 

 

1

 

85

RO-Jaipur

PIU Swaimadhopur

Sawai Madhopur to Sheopur section from km 76.600 to kilometre 112.000 of National Highway 552 Extn in the State of Rajasthan

Daulatpur at Km 106.915 28.01.2023

 

1

86

RO-Odisha

PIU Sambhalpur

from Design Km.493.300 to Km.521.825 and Design Km. 545.176 to Km. 567.400 of Teleibani to Sambalpur Section

Pudapada & Nildungri Fee Plaza at km 551.800

09.01.2023

1

 

87

RO-Jabalpur PIU Gwalior

Porsa-Ater-Bhind Section from Design kilometre 295.200 to kilometer 343.800 (existing km 290.075 to km 340.200) of National Highway 552 Extn. in the State of Madhya Pradesh

Para at km 336.120 09.01.2023

 

1

88

RO-Raipur

PIU Korba

Masaniakala - Rengapali Vill / odisha border (from Km 241.553 to Km 312.600)

Jhalmala

18.01.2023

1

89

RO hyderabad-

PIU Sangareddy

Kandi to Nizampet

kilometre 0.00 to kilometre 66.400

Taddanpally at km 14.620

02.02.2023

1

 

90

 

RO Raipur - PIU Korba

Kunkuri to Chhattisgarh / Jharkhand Border section of NH-78 (new NH- 43) from Km 531.775 to Km 598.450

Lodam Fee Plaza at km 593.350 02.02.2023

 

1

 

91

 

RO Raipur - PIU Korba

 

MP/CG Border to Surajpur section kilometre 245.00 to kilometre 323.100

Maharajpur fee plaza at km 278.150 10.02.2023

 

1

92

 

 

 

 

 

 

RO Delhi-PIU Sohna

 

 

 

 

Delhi-Vadodra Expressway

from km 0.000 to km 228.748 in the states of Haryana and Rajasthan on EPC Mode

15.02.2023

Hilalpur Fee Plaza at Km 12.930

1

93

Khalilpur Fee Plaza at km 19.803

1

94

Kalinger Fee Plaza at km 35+500

1

95

Ghata Samsabad Fee Plaza at km 66.587

1

96

Sheetal Fee Plaza at km 102.000

1

97

Pinan Fee Plaza at km 129+017

1

98

Bhandaraj Fee Plaza at km 181.451

1

99

Dungarpur Fee Plaza at km 210.972

1

100

Badkapara Fee Plaza at km 228.748

1

101

RO Delhi-Bhiwani

PKG 8 (Ismailabad-Narnaul) 211+718

Bhalkhi-211+718

1

 

102

 

RO UP West - PIU Bagpat

Panipat to Shamli section from design kilometer 0.000 to kilometre 35.580 of National Highway number 709AD in the State of Haryana and Uttar Pradesh

 

Tamsabad at km 17.100 01.02.2023

 

1

 

103

 

RO UP West - PIU Kanpur

Harpalpur -Sugira section from design km 92.025 to km 133.500 (existing km 89.600 to km 133.520) on NH-76 in the state of Uttar Pradesh

 

Bamhori Kurmi at km 104.600 04.02.2023

 

1

 

104

 

Ro Jabalpur - PIU Chhatarpur

Satna-Bela Section from Design Km 155.000 to Km 202.040 of NH-75 (New NH-39) in the State of Madhya Pradesh

 

Bela at Km 199.250 22.02.2023

 

1

 

105

 

 

RO Patna - PIU Patna

Arrah to Pararia from design kilometer 0.000 to kilometer 54.530 (Existing km 115.330 of NH-30 to 60.800 of NH30) of National Highway number 319 (Old NH- 30) in the State of Bihar

 

 

Babhniyawan at Design Km 16.030 22.02.2023

 

 

1

 

106

RO Lucknow - PIU Kannauj

Aligarh-Kanpur section from design km 302.108 to km 373.085 (existing km 289.000 to km 356.000)

 

Basheerapur 04.03.2023

 

1

107

RO UP East - PIU Mirzapur

Allahabad-Mirzapur from Design Km 450.150 to Km 486.970

Gopalpur

11.03.2023

1

108

RO Delhi- PIU Mathura

DND- Faridabad - Sohna / 6 Lane From Km 39+000 to Km 59+063

Kiranj Toll Plaza 22.03.2023

 

1

109

RO-Vijaywada / PIU Rajamahendravaram

Gurajanapalli to Pasarlapudi from design Km. 45.000 to Km.106.000

Annampalli @ KM 78.000 04.03.2023

 

1

110

RO-Vijaywada / PIU Visakhapatnam

AP/Odisha Border to Narasannaapeta section of NH-326A) from Design kilometer 0+00 to kilometer 41+979

Gorribanda Toll Plaza 16.03.2023

 

1

 

111

Ro Bangalore- PIU Ramanagra

Bangalore -Mysore section of NH-275 From Existing Km223.860 to Km342.00 (Staggered fee plaza)

Kaniminike at Km 23.900

14.03.2023

 

1

Ro Bangalore- PIU Ramanagra

Sheshagirihalli at Km26.800

14.03.2023

 

112

Ro Bangalore- PIU Tumkur

Tumkur - Shimogga section From Km12+310 (Design Km.12+300) to Km.66+540(Design Chainage 65+195) from Mallasadra to Karadi Village of Nh-206

Rajathadripura at Km. 49+850 13.03.2023

 

1

 

This information was given by the Union Minister of Road Transport and Highways, Shri Nitin Gadkari in a written reply to the Lok Sabha.

 

*****

MJPS/NSK


(रिलीज़ आईडी: 1941055) आगंतुक पटल : 3711