Ministry of Fisheries, Animal Husbandry & Dairying
India Adds 2,361 MW Biomass Capacity, 228 MWe Waste-to-Energy and 2.88 Lakh Biogas Plants in Last Ten Years
Posted On:
17 DEC 2025 12:49PM by PIB Delhi
Ministry of New and Renewable Energy supports installation of Bioenergy Projects in the country under National Bioenergy Programme (NBP), Phase-I, which was notified on 02.11.2022, with a budget outlay of Rs. 998 Crore, for the period 2022-23 to 2025.26. The details of Central Financial Assistance (CFA) provided is given at Annexure-I.
During the last ten years, the Government has been supporting Bioenergy Projects through various Schemes, namely National Biogas and Manure Management Programme (NBMMP) during 12th Five Year Plan, New National Biogas & Organic Manure Programme (NNBOMP) from 2018-19 to 2020-21, Scheme to support promotion of Grid interactive Biomass Power and Bagasse cogeneration in sugar mills during 12th Plan Period, Programme on Energy from Urban, Industrial and Agricultural Wastes /Residues during 12th Plan period, Scheme to support Promotion of Biomass based Cogeneration in Sugar Mills and other Industries in the Country from 2018-19 to 2020-21.
The details of bioenergy projects installed in the country during the last ten years, State-wise, is given at Annexure-II. Further, new bioenergy projects are being promoted under the NBP Phase-I.
Annexure-I
The existing CFA Support for setting up of Bioenergy Projects in the country under National Bioenergy Programme is given as under:
|
Waste to Energy Programme
|
CFA in Rs Crore
|
|
Biogas generation
|
Rs 0.25 Crore per 12000cum/day
|
|
BioCNG generation
|
Rs 4.0 Crore per 4800 kg/day (for BioCNG generation from new biogas plant)
Rs 3.0 Crore per 4800 kg/day (for BioCNG generation from existing Biogas plant)
|
|
Power generation based on Biogas
|
Rs 0.75 Crore/MW (for power generation from new biogas plant)
Rs 0.5 Crore/MW (for power generation from existing Biogas plant)
|
|
Power based on bio & agro-industrial waste
|
Rs 0.4 Crore/MW
|
|
Biomass Gasifier
|
Rs. 2,500 per kWe with dual fuel engines for electrical application
Rs. 15,000 per kWe with 100% gas engines for electrical application
Rs. 2 lakh per 300 kWth for thermal applications
|
|
Biomass Programme
|
CFA
|
|
Briquette manufacturing plants
|
Rs. 9.00 Lakhs/ TPH
(Maximum CFA- Rs. 45.00 Lakh per project).
|
|
Non-Torrefied Pellet manufacturing plant
|
Rs. 21 lakhs/MTPH production capacity or 30% of the capital cost considered for plant and machinery of 1 TPH plant, whichever is lower (Maximum Rs. 105 lakhs per project)
|
|
Torrefied Pellet manufacturing plant
|
Rs. 42 lakhs/MTPH production capacity or 30% of the capital cost considered for plant and machinery of 1 TPH plant, whichever is lower (Maximum Rs. 210 lakhs per project)
|
|
Non-Bagasse Cogeneration Projects
|
Rs. 40 Lakhs/ Megawatt
Maximum CFA- Rs. 5.00 Crore per project).
|
|
Biogas Programme
|
CFA
|
|
For small biogas plants (1-25 cubic meter/day plant capacity):
|
Rs. 9,800/- to Rs. 70,400/- per plant based on size of the plant in cubic meter
|
|
For Power generation and thermal application (25 - 2500 cubic meter/day plant capacity):
|
Rs. 35,000/- to Rs. 45,000/- per kilowatt for power generation
Rs. 17,500/- to Rs. 22,500/- per kilowatt equivalent for thermal applications.
Note: 20% higher than Standard CFA in for NER, Island, Registered Gaushalas and SC/ST beneficiaries);
|
Annexure-II
REFERRED TO IN REPLY TO THE LOK SABHA UNSTARRED QUESTION NO. 2809, Part (d) TO BE ANSWERED ON 17.12.2025 on ‘Financial Assistance for Bio-Energy Programme’.
The details of bioenergy projects installed in the country during the last ten years is given as under:
|
|
|
Biomass Projects
|
Waste to Energy Projects
|
Biogas Plants
|
|
Sl No
|
State
|
Capacity (MW)
|
Capacity (MWe)
|
Nos
|
|
1
|
Andhra Pradesh
|
35.1
|
35.95
|
28505
|
|
2
|
Arunachal Pradesh
|
0
|
0
|
349
|
|
3
|
Assam
|
2
|
0
|
23612
|
|
4
|
Bihar
|
39.8
|
0.32
|
236
|
|
5
|
Chhattisgarh
|
54
|
0
|
11030
|
|
6
|
Goa
|
0
|
1
|
140
|
|
7
|
Gujarat
|
12
|
15.2
|
5427
|
|
8
|
Haryana
|
87.4
|
17.39
|
3487
|
|
9
|
Himachal Pradesh
|
1.5
|
0
|
294
|
|
10
|
Jharkhand
|
14.8
|
1.04
|
545
|
|
11
|
Karnataka
|
536.81
|
8.41
|
34657
|
|
12
|
Kerala
|
1.55
|
0.23
|
9639
|
|
13
|
Madhya Pradesh
|
31.2
|
5.86
|
32120
|
|
14
|
Maharashtra
|
1073.5
|
24.26
|
71653
|
|
15
|
Manipur
|
0
|
0
|
25
|
|
16
|
Meghalaya
|
0
|
0
|
867
|
|
17
|
Mizoram
|
0
|
0
|
648
|
|
18
|
Nagaland
|
0
|
0
|
102
|
|
19
|
Odisha
|
0.6
|
0
|
5966
|
|
20
|
Punjab
|
140.29
|
21.77
|
19288
|
|
21
|
Rajasthan
|
19.85
|
1.19
|
2404
|
|
22
|
Sikkim
|
0
|
0
|
170
|
|
23
|
Tamil Nadu
|
112.55
|
8.68
|
1740
|
|
24
|
Telangana
|
4.03
|
9.79
|
11159
|
|
25
|
Tripura
|
0
|
0
|
546
|
|
26
|
Uttarakhand
|
12.5
|
6.89
|
8362
|
|
27
|
Uttar Pradesh
|
146.6
|
41.34
|
3594
|
|
28
|
West Bengal
|
31.6
|
4.06
|
851
|
|
29
|
Andaman and Nicobar Islands
|
0
|
0
|
0
|
|
30
|
Chandigarh
|
0
|
0
|
0
|
|
31
|
Dadra and Nagar Haveli and Daman & Diu
|
3.75
|
0
|
18
|
|
32
|
NCT of Delhi
|
0
|
24.17
|
0
|
|
33
|
Jammu & Kashmir
|
0
|
0
|
101
|
|
34
|
Ladakh
|
0
|
0
|
0
|
|
35
|
Lakshadweep
|
0
|
0
|
0
|
|
36
|
Puducherry
|
0
|
0
|
0
|
|
37
|
Others
|
0
|
0
|
10544
|
|
|
Total
|
2361.43
|
227.56
|
288079
|
***
Navin Sreejith
(Release ID: 2205042)