Ministry of Jal Shakti
azadi ka amrit mahotsav

STATUS OF NATIONAL RIVERS INTERLINKING PROGRAMME

Posted On: 10 AUG 2026 4:50PM by PIB Delhi

Government of India formulated the National Perspective Plan (NPP) for Inter-Basin Water Transfer and 30 Interlinking of Rivers (ILR) Projects were identified under NPP (16 link projects under the Peninsular component and 14 link projects under the Himalayan component). National Water Development Agency (NWDA) has been entrusted with the work of ILR. The present status of all 30 ILR projects is at Annexure.

The Ken-Betwa Link Project (KBLP) is the only priority link project under the NPP that has entered the implementation stage. The project, with an estimated cost of ₹44,605 crore, is envisaged to provide irrigation to about 11.88 lakh hectares, drinking water supply to about 62 lakh people, 103 MW of hydropower and 27 MW of solar power.

In addition, the Polavaram Irrigation Project (PIP), which incorporates the Godavari (Polavaram)–Krishna (Vijayawada) link, stands classified as a National Project and is executed by the Government of Andhra Pradesh and Polavaram Project Authority (PPA). The project envisages irrigation to about 7.2 lakh acres and stabilization of 23.5 lakh acres in the Godavari and Krishna delta systems, diversion of 80 TMC of Godavari water to the Krishna basin, drinking and industrial water supply including to Visakhapatnam, domestic water supply to about 28.5 lakh population in 611 villages, and hydropower generation of 960 MW. The Polavaram Irrigation Project has received cumulative Central Assistance of ₹20,658 crore.

An Environmental Impact Assessment (EIA) forms part of the preparation of Feasibility Reports (FRs) and Detailed Project Reports (DPRs) for every Interlinking of Rivers (ILR) project, with assessment of environmental and socio‑economic impacts. For the Ken–Betwa Link Project, a comprehensive EIA has been completed along with an Integrated Landscape Management Plan (ILMP), which outlines measures relating to catchment‑area treatment, landscape‑level ecological management, biodiversity conservation, command‑area development and long‑term monitoring of environmental parameters. For all ILR projects, including the Ken–Betwa Link Project, Land Acquisition and Rehabilitation & Resettlement (R&R) components stand included in the sanctioned project structure, and project execution conforms to applicable environmental, forest‑clearance and R&R provisions.

***

ANNEXURE

THE DETAILS OF RIVER LINKING PROJECTS WITH THEIR PRESENT STATUS:

Peninsular Component

Sl.No

Name

States benefited

Status

1

Mahanadi (Manibhadra) - Godavari (Dowlaiswaram) link

Andhra Pradesh (AP) and Odisha

Feasibility Report completed

Alternate Mahanadi (Barmul)- Rushikulya–Godavari Dowlaiswaram) link

AP and Odisha

Feasibility Report completed

2

Godavari (Polavaram) - Krishna (Vijayawada) link @

AP, Karnataka, Maharashtra and Telangana

Feasibility Report completed

3

a.) Godavari (Inchampalli) - Krishna (Nagarjunasagar) link

Telangana

Feasibility Report completed

b.) Alternate Godavari (Inchampalli) - Krishna (Nagarjunasagar) link *

Telangana

 

DPR completed

4

Godavari (Inchampalli/ SSMPP) - Krishna (Pulichintala) link

Telangana and AP

DPR completed

5

a.) Krishna (Nagarjunasagar) - Pennar (Somasila ) link

AP

Feasibility Report completed

b.)Alternate Krishna (Nagarjunasagar) - Pennar (Somasila ) link *

AP

 

DPR completed

6

Krishna (Srisailam) – Pennar link

AP

DPR Completed

7

Krishna (Almatti) – Pennar link

Karnataka &AP

DPR completed

8

a.) Pennar (Somasila) - Cauvery (Grand Anicut) link

AP, Tamil Nadu and Puducherry

Feasibility Report completed

b.) Alternate Pennar (Somasila) - Cauvery (Grand Anicut) link *

AP, Tamil Nadu and Puducherry

 

DPR completed

9

Cauvery (Kattalai) - Vaigai -Gundar link

Tamil Nadu

DPR completed

10

a) Parbati –Kalisindh - Chambal link

Madhya Pradesh (MP) and Rajasthan

Feasibility Report completed

b) Modified Parbati – Kalisindh-Chambal link

MP and Rajasthan

MoA for implementation has been signed by both the States

11

Damanganga - Pinjal link

Maharashtra (only water supply to Mumbai)

DPR completed and dropped from status of “priority links”

12

Par-Tapi-Narmada link

Gujarat and Maharashtra

DPR completed and dropped from status of “priority links”

13

Ken-Betwa link

Uttar Pradesh (UP) and MP

DPR completed and work has been commenced.

14

Pamba - Achankovil - Vaippar link

Tamil Nadu and Kerala

Feasibility Report completed

15

Bedti - Varda link @@

Karnataka

DPR completed

16

Netravati – Hemavati link**

Karnataka

Pre-Feasibility Report completed

* Due to pending consensus on Manibhadra and Inchampalli dams, Phase-I of the Project to divert unutilized waters of Godavari River was carried out, and DPR of Godavari (Inchampalli) – Krishna (Nagarjunasagar) - Pennar (Somasila) – Cauvery (Grand Anicut) link projects (combined) called the Godavari-Cauvery link was completed. The report has further been updated, terminating the link canal at Manimukhta nadi, a Tributary of the Vellar River flowing adjacent to the Cauvery basin.

@@ Bedti – Varda Link - DPR was prepared directly after preparation of its PFR; no FR was prepared.

@ Godavari (Polavaram) - Krishna (Vijayawada) Link- the project has been completed by the Govt. of Andhra Pradesh and Polavaram Project Authority.

** Netravati – Hemavati link: Further studies not taken up after PFR preparation since, after implementation of the Yettinahole project by the Govt. of Karnataka, no surplus water is available in Netravati basin for diversion through this link.

HIMALAYAN COMPONENT

Sl.No

Name

States/Countries benefited

Status

1.

Kosi-Mechi link***

Bihar and Nepal

PFR completed and proposal dropped

2.

Kosi-Ghaghra link

Bihar, Uttar Pradesh (UP) and Nepal

Feasibility Report completed

3.

Gandak - Ganga link

UP and Nepal

Feasibility Report completed

4.

Ghaghra - Yamuna link

UP and Nepal

Feasibility Report completed

5.

Sarda - Yamuna link

UP and Uttarakhand

DPR Completed

6.

Yamuna-Rajasthan link

Haryana and Rajasthan

Feasibility Report completed

7.

Rajasthan-Sabarmati link

Rajasthan and Gujarat

Feasibility Report completed

8.

Chunar - Sone Barrage link

Bihar and UP

Feasibility Report completed

9.

Sone Dam - Southern Tributaries of Ganga link

Bihar and Jharkhand

Draft FR completed

10.

Manas-Sankosh-Tista-Ganga (M-S-T-G) link

Assam, West Bengal and Bihar

Feasibility Report completed

11.

Jogighopa-Tista-Farakka link (Alternative to M-S-T-G)

Assam, WB and Bihar

PFR completed

(The proposal has been dropped)

12.

Farakka-Sundarbans link

WB

Feasibility Report completed

13.

Ganga (Farakka) - Damodar-Subarnarekha link

WB, Odisha and Jharkhand

Feasibility Report completed

14.

Subarnarekha-Mahanadi link

WB and Odisha

Feasibility Report completed

Kosi-Mechi link *** - Kosi Mechi Inter State link was dropped due to international dimensions and on request of State Govt. of Bihar, Kosi-Mechi Intra State link was studied by NWDA and its DPR was submitted to State Govt.

The information was provided by THE MINISTER OF STATE FOR JAL SHAKTI SHRI RAJ BHUSHAN CHOUDHARY in a written reply to a question in Rajya Sabha today.

***

ND/HM

(Rajya Sabha USQ 2473)


(Release ID: 2297168) Visitor Counter : 861