|
Sl. No
|
Name
|
States concerned
|
States benefited
|
Annual Irrigation (Lakh ha)
|
Domestic and Industrial supply (MCM)
|
Hydropower
(MW)
|
Present status
|
|
Peninsular Component
|
|
|
|
|
|
|
|
1
|
Mahanadi (Manibhadra) - Godavari (Dowlaiswaram) link
|
Odisha, Maharashtra, AP, Karnataka, Chattisgarh& Telangana
|
Andhra Pradesh& Odisha
|
0.91+3.52 = 4.43
|
802
|
445
|
FR completed
|
|
2
|
Godavari (Inchampalli) - Krishna (Pulichintala) link
|
-do-
|
Telangana and Andhra Pradesh
|
1.09+5.04=
6.13
|
413
|
--
|
FR completed
|
|
3
|
Godavari (Inchampalli) - Krishna (Nagarjunasagar) link
|
Odisha, Maharashtra, Madhya Pradesh, AP, Karnataka, Chattisgarh &
Telangana
|
Telangana
|
2.87
|
237
|
975
|
FR completed
|
|
4
|
Godavari (Polavaram) - Krishna (Vijayawada) link
|
Odisha, Maharashtra, AP, Karnataka, Chattisgarh&
Telangana
|
Andhra Pradesh
|
5.82
|
162
|
--
|
FR completed
|
|
5
|
Krishna (Almatti) – Pennar link
|
Maharashtra, Karnataka, Telangana&
AP
|
Andhra Pradesh& Karnataka
|
1.90+0.68 = 2.58
|
56
|
--
|
FR completed
|
|
6
|
Krishna (Srisailam) – Pennar link
|
-do-
|
--
|
--
|
--
|
17
|
FR completed
|
|
7
|
Krishna (Nagarjunasagar) - Pennar (Somasila ) link
|
Maharashtra, AP& Karnataka
|
Andhra Pradesh
|
5.81
|
124
|
90
|
FR completed
|
|
8
|
Pennar (Somasila) - Cauvery (Grand Anicut) link
|
AP, Karnataka, Tamil Nadu, Kerala & Puducherry
|
AP, Tamil Nadu & Puducherry
|
0.49+4.36 + 0.06 = 4.91
|
1105
|
--
|
FR completed
|
|
Sl. No
|
Name
|
States concerned
|
States benefited
|
Annual Irrigation (Lakh ha)
|
Domestic and Industrial supply (MCM)
|
Hydropower
(MW)
|
Present status
|
|
9
|
Cauvery (Kattalai) - Vaigai -Gundar link
|
Karnataka, Tamil Nadu, Kerala & Puducherry
|
Tamil Nadu
|
3.38
|
185
|
--
|
FR completed
|
|
10
|
Ken-Betwa link
a) Ken-Betwa Link Phase-I
b) Ken-Betwa link Phase-II
|
Uttar Pradesh & Madhya Pradesh
- do-
|
Uttar Pradesh &Madhya Pradesh
Madhya Pradesh
|
2.66 + 3.69 =6.35
0.99
|
49
6
|
78
-
|
FR&DPR
(Ph-I&II) completed
|
|
11
|
Parbati -Kalisindh- - Chambal link
|
Madhya Pradesh, Rajasthan & Uttar Pradesh (UP requested to be consulted during consensus building )
|
Madhya Pradesh& Rajasthan
|
*Alt.I: 2.05+ 0.25 =2.30 (Alt.II: 1.77+ 0.43 = 2.20)
|
13.2
|
--
|
FR completed
|
|
12
|
Par-Tapi-Narmada link
|
Maharashtra & Gujarat
|
Gujarat& Maharashtra
|
2.32
|
76
|
22
|
FR&DPR completed
|
|
13
|
Damanganga- Pinjal link
(As per DPR )
|
-do-
|
Maharashtra (only water
supply to Mumbai)
|
--
|
895
(including 316 MCM from Pinjal dam proposed by GoM)
|
--
|
FR&DPR completed
|
|
14
|
Bedti- Varda link
|
Maharashtra, Andhra Pradesh & Karnataka
|
Karnataka
|
0.60
|
--
|
4
|
PFR completed
|
|
15
|
Netravati– Hemavati link
|
Karnataka, Tamil Nadu & Kerala
|
Karnataka
|
0.34
|
--
|
--
|
PFR completed.
|
|
16
|
Pamba- Achankovil- Vaippar link
|
Kerala & Tamil Nadu,
|
Kerala& Tamil Nadu
|
0.91
|
--
|
508
|
FR completed
|
|
Himalayan Component
|
|
Sl. No
|
Name
|
States concerned
|
States benefited
|
Annual Irrigation (Lakh ha)
|
Domestic and Industrial supply (MCM)
|
Hydropower
(MW)
|
Present status
|
|
1.
|
Manas-Sankosh-Tista-Ganga (M-S-T-G) link
|
Assam, West Bengal, Bihar& Bhutan
|
Assam, West Bengal & Bihar
|
2.08 + 1.82 + 2.64 = 6.54
|
--
|
5287
|
PFR completed
|
|
2.
|
Kosi-Ghaghra link
|
Bihar , Uttar Pradesh &Nepal
|
Bihar& Uttar Pradesh
|
8.17+ 0.67 + 1.74 (Nepal) = 10.58
|
48
|
--
|
PFR completed
|
|
3.
|
Gandak-Ganga link
|
-do-
|
Uttar Pradesh
|
37.99+2.41 (Nepal) = 40.40
|
700
|
--
|
Draft FR completed (Indian portion)
|
|
4.
|
Ghaghra-Yamuna link
|
-do-
|
Uttar Pradesh
|
25.30 + 1.35 (Nepal) =26.65
|
1391
|
10884
|
FR completed (Indian portion)
|
|
5.
|
Sarda-Yamuna link
|
Bihar, UP, Haryana, Rajasthan, Uttarakhand & Nepal
|
Uttar Pradesh & Uttarakhand
|
3.45 + 0.30 = 3.75
|
6250
|
3600
|
FR completed (Indian portion)
|
|
6.
|
Yamuna-Rajasthan link
|
UP, Gujarat, Haryana & Rajasthan
|
Haryana & Rajasthan
|
0.435 + 2.442 = 2.877
|
57
|
--
|
Draft FR completed
|
|
7.
|
Rajasthan-Sabarmati link
|
-do-
|
Rajasthan & Gujarat
|
5.35 + 2.04= 7.39
|
282
|
--
|
Draft FR completed
|
|
8.
|
Chunar-Sone Barrage link
|
Bihar& UP
|
Bihar& Uttar Pradesh
|
0.30 + 0.37= 0.67
|
--
|
--
|
Draft FR completed
|
|
9.
|
Sone Dam – Southern Tributaries of Ganga link
|
Bihar & Jharkhand
|
Bihar & Jharkhand
|
2.99 + 0.08=3.07
|
360
|
95
|
PFR completed
|
|
10.
|
Ganga(Farakka)-Damodar-Subernarekha link
|
West Bengal, Odisha & Jharkhand
|
West Bengal, Odisha & Jharkhand
|
7.63 + 0.30 + 0.55 = 8.47
|
484
|
-
|
Draft FR completed
|
|
11.
|
Subernarekha-Mahanadi link
|
West Bengal& Odisha
|
West Bengal& Odisha
|
0.18 + 0.365 = 0.545
|
--
|
9
|
Draft FR completed
|
|
12.
|
Kosi-Mechi link
|
Bihar, West Bengal & Nepal
|
Bihar
|
2.99 + 1.75 (Nepal) = 4.74
|
24
|
3180
|
PFR completed
(Entirely lies in Nepal)
|
|
13.
|
Farakka-Sunderbans link
|
West Bengal
|
West Bengal
|
1.50
|
184
|
--
|
Draft FR completed
|
|
14.
|
Jogighopa-Tista-Farakka link (Alternative to M-S-T-G)
|
-do-
|
Assam, West Bengal &Bihar
|
----
|
216
|
1115
|
Alternate to M-S-T-G link dropped.
|