04 JUL 2019 2:41PM by PIB Delhi
Ongoing Highway Projects in Karnataka

The details of the ongoing National Highway projects in the State of Karnataka, the funds allocated, sanctioned and status of implementation of each project are as below:

Sl.   No.

Project Name

Mode

Estimated cost (Rs. in Cr)

Total Length (km)

Length Completed upto May, 2019

 

 

1

Four laning of Kundapur to Surathkal (Km.283.300 to Km.358.000) and Nantoor to Talapady (Km.375.300 to Km.376.600 (Panaji – Mangalore section) & Km.3.600 to Km.17.200 (Mangalore-Cochin section) section of NH-17)

BOT (Toll)

671

90.08

87.63

2

4-laning of Maharashtra/Karnataka Border to Sangareddy section of NH-9 (from km.348+800 to km.423+800 in the State of Karnataka & Telangana

BOT (Toll)

1544

145

143.00

3

Four laning of Goa-Karnataka Border to Kundapur section of NH-66 (formerly NH-17) from Km. 93.700 to Km. 283.300

BOT (Toll)

1655.01

187.24

132.24

4

Two lane with paved shoulders of Bijapur-Gulbarga-Humnabad section of NH-218 from Km 195.00 to 418.00.

EPC

523

220

219.42

5

Four laning of Hospet-Chitradurga section of NH-13 from Km.299.000 to Km.418.600

BOT (Toll)

1388

120

105.50

6

4-laning of Hassan to Maranahally section of NH-48 (Package-I)

EPC

573

45.14

0.00

7

4-laning of Addahole (near Gundya) to Bantwal Cross section of NH-48 (Package-II)

EPC

821.08

63.05

0.00

8

Four lanning of Hospet  - Hubli  Section of NH-63 from Km.132 to Km.268.700

EPC

1334.7

143.72

89.00

9

4/6 laning of Hospet – Bellary – Karnataka / AP Border from KM.280.300 to 375.740 of NH-63

EPC

870

95

36.50

10

2/4 laning of Tamilnadu/Karnataka Border to Bangalore section of NH-209

HAM

1008

171

106.00

11

6 laning of Haveri - Hubli section of NH-4

HAM

983

63.4

36.88

12

6-laning of Davangere -Haveri section of NH-4

HAM

1177

78.93

40.20

13

6 laning of Chitradurga - Davangere section of NH-4

HAM

1434

72.7

38.00

14

6 laning of Bangalore - Nidagatta  section of NH-275

HAM

3700

56.2

0.00

15

4-laning of Belgaum-Khanapur Section of NH 4A.

HAM

962

30

0.00

16

2 laning with paved shoulders of Khanapur-Knt/Goa Border section of NH 4 A

EPC

609

52.3

18.85

17

4- laning of Byrapura – Chalkere section of NH-150A from Km.309/150 to Km. 359/100 (Package-II)

HAM

841.7

49.95

5.00

18

Rehabilitation  &  Upgradation of  Chitradurga- Shimoga  section of NH 13  ( km 422.000 to 528.300)  to 2  Lane with P.S under  NHDP IV on EPC mode

EPC

471.16

66.628

66.30

19

Estimate for widening to two lane to four lane from km 129.00 to km 144.00 of NH-63 AnkolaGooty section passing through Hubballi city limits (job no: NH:63:KNT:2016-17-838)

EPC

171.6

13.40

0.00

20

Construction of Major Bridge at Km.180.865 across river Krishna on NH 167 HagariJadcherla section (Job No NH:167:KNT:13:2016-17-009-S&R(B))

EPC

157.318

-

-

21

Providing & fixing road signagesetc Km. 590.00 to Km. 671.00 (NH-169-KNT-2016-17-813)

Item rate

9.27

-

-

22

Reconstruction of Major Bridge at Km 648.17 and Minor Bridges at 650.204, Km 654.830, Km 655.93, Km 660.030 & at Km 663.300 on NH-169(Old NH 13) of Sholapur-Mangalore Section in the State of Karnataka Job No NH-169-KNT-2017-18-817

Item rate

48.75

-

-

23

Construction of Major bridge at Km.735.800 across river Phalghuni near Gurupura on NH 169 on EPC mode in  Karnataka (Job No.NH-169-KNT-2018-19-894)

EPC

37.83

-

-

24

Improvement and reconstruction to two lane with paved shoulders from Km 24.60 to Km 70.063 of Mudigere – Kadur section of NH-173 through EPC mode

EPC

297.3

45.46

0.00

25

Strengthening from Km 40.00 to 57.30 on NH-207, Sarjapura-Dabasapete Section in the State of Karnataka.(Job No.NH-207/KNT/2017-18-862)

Item rate

17.72

17.3

7.22

26

Construction of 2 lane ROB and its approaches in lieu of existing level crossing No.130  at Km.48.3 on NH 207 near Koraluruin Karnataka( job no: NH:207:KNT(7):2016-17-010-S&R(B)

EPC

42.46

-

-

27

Estimate for Strengthening and widening with paved shoulder from Km 153/00 to 193/35 of BijapurHubli Section of NH 218 in the State of Karnataka on EPC mode. (NH-218-KNT-2014-15-735)

EPC

110.90

38.00

37.70

28

Construction of proposed 4 lane RUB and its approaches in lieu of existing level crossing No.41 at Km.365.110 (railway chainage 73/2-3) on NH 234 at Gauribindanur bypass in the state of Karnataka (Job No.NH-234/KNT(8)/16-17-S&R(B)-014 dt. 18.07.2017)

EPC

67.13

-

-

29

Widening to two lane with paved shoulder  from Km 194.900 to Km 243.200 of NH-234  banavara-Huliyar Section  in Karnataka state under EPC mode(Job no: NH-234-KNT-2017-18-870)

EPC

191.6

48.3

0.00

30

Rehabilitation & upgrading to 2 lanes/2 lane with paved shoulders configuration and strengthening of Madhugiri-Chikkaballapura-Mulbagal section from Km 343.800 to Km 483.151 of NH 234 in the state of Karnataka Under  NHIIP                                                                                                                           (Lot-I Km.343.800  to 400.330)

EPC

168.15

56.53

47.80

31

Estimate for the work of widening to two lane with paved shoulders from km 99.20 (Kottigehara) to km 113.71 (Mudigere hand post) of NH-73 (NH-234) in the State of Karnataka

Item rate

48.58

14.51

0.00

32

Construction of Bridges of Manu Halla at Km 25.10 bridge across Nethravathi river at Km 63.95 & Bridge across CharmudiHalla at Km 74.90 of NH4 (Job No NH50/KNT/(2)/17S&R/016)

Item rate

23.82

-

-

33

Construction of two lane with paved shoulders from km 19.80 to km 40.00 of NH 234 ( Job No NH-234/KNT/2017-18/875

EPC

159.7

19.8

0.00

34

Reconstruction of Major Bridge at km 218.840 of HuliyarBanvara section in the State of Karnataka. .(Job No.NH-234/KNT(1)/2016-S&R(B)-017)

Item rate

14.09

-

-

35

Strengthening of road from km 132.324 to 169.000 of NH-275 Bantwala - Bengaluru section in the state of karnataka. (Job no: NH-275-KNT-2017-18-861Dt 25.08.2017) 

Item rate

26.43

36.676

10.00

36

Strengthening of  road from km 171.850 to 190.500  & Km 193.560 to Km 199.50 of NH-275 Bantwala - Bengaluru section in the state of karnataka. (Job no: NH-275-KNT-2017-18-860 Dt 25.08.2017) 

Item rate

24.34

21.14

0.00

37

Construction of Major Bridge near Talbal and Nitali at Km 4.90 and Km 6.50  respectively on NH367 in the State of Karnataka( job no: NH:367:KNT(1):15:2016-17-011-S&R(B)

Item rate

29.42

-

-

38

Construction of 2L+PS from Km 13.00 to Km 33.16 of NH-367 from Banapur to Bagalkote section in the State of Karnataka.(Job no: NH367:KNT-2017-18-869)

Item rate

96.88

20.16

8.00

39

Reconstruction of CD No 551/2 at Km 550.340 (Km 550.430), CD No 552/1 at Km 551.280 (Km 552.230), CD No 565/4 at Km 564.900, CD No 575/2 at Km 574.510 (Km 574.500), CD No 586/2 at Km 585.410 (Km 585.500), CD No 586/3 at Km 585.540 (Km 585.600) and constru 013 KNT 2014 760

Item  Rate

18.92

-

-

40

Strengthening with widening to two lane from km 533.500 to km 551.600, km 561.650 to km 568.00 and from km 571.00 to km 590.50 of NH-13 Sholapur-Mangalore Section in the state of karnataka(NH-13-KNT-2016-17-811)

Item  Rate

70.94

43.95

0.00

41

Widening to two lane with paved shoulders from Km. .34.00 to Km. 70.90 (Maharashtra borderChitapur Cross to Yadgiri  ) section of NH-150 in the State of Karnataka through EPC mode. (Package-I)(NH 150-KNT-16-17-828)

EPC

317.16

36.90

28.20

42

Widening to two lane with paved shoulders from Km. 77.250 to Km. 116.07 of NH-150 excluding Yadgir bypass (End of Yadgir bypass to Andhra border section) in the State of Karnataka through EPC mode. (Package-II) (NH50-KNT-16-17-817)

EPC

329.01

38.82

33.57

43

Widening to Two Lane with Paved Shoulders from Km. 646.324( old Ch. km: 603.600 ) to Km 658.824 ( old Ch. km:616.100 )and from Km 666.124 to Km 669.124 Jewargi - Chamrajnagara section  on NH 150A   in the state of Karnataka  (Job no: NH-150A-KNT-2017-18-859 Dt 25.08.2017) 

Item rate

69.24

14.52

6.50

44

Km. 544.20 to 594.00 (Hosmane cross to Pandavapura) widening to 2-lane wih paved shoulder (Job No.NH-150A-KNT-2016-17-835)

EPC

251.13

49.1

36.00

45

Widening to 2L+PS from Km 214.88 to 235.10 of NH150A (NH150A-KNT-2017-18-878)

Item rate

94.01

20.22

0.00

46

Widening to two lane with paved shoulder from Km 0/00 to 14/90 of NH-167 ( Hagari- Jadcherla) (NH-167-KNT-2015-16- 796)

Item  Rate

62.83

14.90

14.60

47

Widening to Two lane with Paved Shoulders from Km. 125.626 to 155.800 of NH-167 Hagari to Jadacherla Section in the State of Karnataka on EPC Mode (Package-1) (NH-167-KNT-2016-17-814)

EPC

175.20

30.17

28.50

48

Estimate for the work of Road Safety Measures to the NH-169A, providing and Fixing of Road Signages, Crash Barriers, Delinator, Road Studs etc., from Km. 0.000 to 91.200 of NH-169A Thirthahalli Section in the State of Karnataka (169A-KNT-16-17-829)

Item rate

6.87

-

-

49

Construction of two lane with paved shoulders from km 2.00 to km 15.98 of NH-169A (Job no: NH169A:KNT-2017-18-874)

Item rate

86.66

13.98

0.00

50

Reconstruction of Minor Bridges at Km 29.60 and Km 30.89 on NH 169A Thirthahalli-Udupi Section in the state of Karnataka. 169A KNT 2017-18 872

Item rate

6.45

-

-

51

Construction of four lane from Ds Ch 76.04 (Ex Km 77) to 85.20 (Ex Km 87) from Parkala to Malpe section of NH 169A in the State of Karnataka.

Item rate

99.86

9.00

3.45

52

Construction of New Bridge at km 238.050 of NH-206.(NH 206 KNT 2013-14 724)

Item  Rate

11.32

-

-

53

Providing crash barrier from Km 299 to Km.370.5 (selected stretches) of NH-206 Tumkur-Honnavar Section (NH-206-KNT-2014-15-738)

Item  Rate

7.53

-

-

54

Improvements to NH-206 Widening the road from single lane to two lane and intermediate lane to 2lane from Km 299.60 to 348.00 in selected reaches of Tumkur-Honnavarasection in the state of Karnataka.NH-(206/KNT 2016-17/809)

Item  Rate

58.12

48.40

30.00

55

Estimate for widening to four lane divided carriageway with paved shoulder from km 205.20 to km 220.00 of NH 206, Tumkur-Honnavara Section & widening to two lane with paved shoulders from km 522.25 to 525.25 of NH-13, sholapur-mangalore section in Shimoga(NH-206&13-KNT-2016-17-818)

Item  Rate

95.82

17.80

0.00

56

Widening Two Lane with Paved Shoulders from Km.56.00 to 106.00 of NH-218 (218-KNT-2014-15-775)

EPC

159.12

50.00

40.15

57

Widening Two Lane with Paved Shoulders from Km.106.00 to 153.00 of NH-218 (218-KNT-2014-15-776)

EPC

165.67

47.00

19.00

58

Construction of bypass to Hubli city connecting NH 218 &NH63  (NH-218 &63 -KNT-2015-16-790)

Item  Rate

68.10

3.80

0.00

59

Estimate for widening to two lanes with paved shoulders from Km. 483.591 to Km. 494.450 of NH-234 Chintamani to Andhra Pradesh Border section in the State of Karnataka (NH-234-KNT-2016-17-812)

Item  Rate

60.37

10.86

7.86

60

Improvements and Re Construction to Two lane with Paved Shoulders from Km. 243.200 to Km. 290.200 of NH-234 Huliyar to Sira Section in the State of Karnataka on EPC Mode (NH-234-KNT-2016-17-815)

EPC

255.28

46.76

0.00

61

Estimate for improvements to Channapatna town limit from km 297.5 to 301.57 of NH 275 Bantwalabangalore section (NH275-KNT-16-17-824

Item  Rate

44.95

4.07

3.00

62

Estimate for improvements to Ramanagara town limit from km 308.50 to 314.50 of NH 275 Bantwala Bangalore section (NH275-KNT-16-17-825

Item  Rate

52.08

6.00

5.50

63

Widening to two lane with paved shoulders from Km. 54.37 to Km. 101.40 (Bidar to Humnabad) section of NH-50 in the State of Karnataka through EPC mode. (Package-II) (NH50-KNT-16-17-816)

EPC

367.44

47.03

3.11

64

Widening to two lane with paved shoulders from Km. 0.00 to Km. 54.37 (Maharashtra border to Bidar) section of NH-50 in the State of Karnataka through EPC mode. (Package-I)(NH50-KNT-16-17-823)

EPC

396.96

54.37

31.35

65

Estimate of widening from two lane to four lane from km 106 to 110 of NH 63 AnkolaGooty section passing through Kalghatagi city limits(063-KNT-16-17-832)

Item  Rate

50.24

4.00

2.00

66

Widening to 2L+PS from km 4.40 to 56.00 of Nh 218 Bijapur-Hubli Section in the state of karnataka (218-KNT-16-17-836)

EPC

291.49

51.955

40.00

67

Estimate for improvements to road from chennamma circle (km 407.700 of NH4) to Bankapurchowk (km 405.200 on old NH4( (SH 73 from km 249.00 to km 251.00) in Hubballi city limits(064-KNT-16-17-830)

Item  Rate

39.08

3.00

2.50

68

Estimate for improvements to Km 233.00 to Km 238.00 of Mulabagal City limits on old NH-4 ( Old NH4-KNT-16-17-827)

Item  Rate

39.52

5.00

4.70

69

Estimate for improvements to road from Jubli circle (Km 433.300 of NH-4) to Narendra bypass (Km 438.92 on old NH-4) (SH-73 from Km 229.220 to 223.600) in Dharwad city limits (004-KNT-16-17-831)

Item  Rate

71.09

5.60

2.48

 

            The details of National Highway projects in the State of Karnataka planning to commence during current financial year 2019-20 are given below:

Sl.   No.

Project Name

Estimated cost (Rs. in Cr)

Total Length (km)

 

1

Nidagatta - Mysore (6 laning) - NH-275

3300

61.104

2

4 lane of Tumkur - Shimoga section of NH-206 from km 12+310 to km 66+540 (Package - I)

907

53

3

4 lane of Tumkur - Shimoga section of NH-206 from km 66+540 to km 119+790 (Package - II)

1144

57

4

4 lane of Tumkur - Shimoga section of NH-206 from km 119+790 tokm 166+100 (Package - III)

971

48

5

2 lane with paved shoulders of Bellakere Port to Kumtasirsi road section of NH-676E

360.6

58.92

6

4 laning of Bellary - Byrapura section of NH-150A

1313.9

54.95

7

4 laning of Chalkere - Hiriyur section of NH-150A

1157

55.705

8

4 laning of  Bettadahalli – Shivmoga section of NH-206  Pkg-IV

972.39

56.35

9

6 laning of Nelamangala - Tumkur Section of NH-48

1152.66
 

44.73

10

Widening of Channarayanapatna Bypass from 2 Lane with paved shoulder to 4 Lane, in Devihalli ( km 108+456/contractual km 110+000) To Channarayanapatna (Km 150+000) Section of NH-75 (old NH-48), on EPC Basis

451.4

10.4

11

Widening of Hassan Bypass from from 2 Lane with paved shoulder to 4 Lane, in Channarayanapatna (Km 150+000) To Hassan (km 185+668/contractual km 189+500) Section of NH-75 (old NH-48), on EPC Basis

372.19

10.314

12

6-laning of Dobaspet to Doddaballapur bypass section of NH-648 (old NH-207)

1447.35

48

13

4/6-laning of Doddaballapur bypass to Hoskote section of NH-648 (old NH-207)

1178.59

32

14

Reconstruction to Two Lane with Paved Shoulders from Ds.CH. 442+180 to Ds.CH.485.240 of Huliyar to KB Cross section & from  Ds.CH. 532+100 to Ds.CH.539+100 (from KB Cross to Nelligere section of NH-150A

242.61

50.06

15

Construction of 4 lane ROB and its approaches in lieu of existing level crossing 75 at Km.15 on NH 218 in Karnataka(Job No NH:218:KNT:2016-17-008-S&R(B))

58.129

-

 

The proposed Expressway between Bengaluru and Chennai is a greenfield expressway of length of 285 km. The Project is under DPR stage.  The project will be taken up based on the outcome of the DPR and availability of funds.

This information was given by Shri Nitin Gadkari, Union Minister for Road Transport & Highways in response to a question in Lok Sabha today.            

*****