There has been extensive media coverage recently of the
matter relating to the allocation of Talabira-II and
III coal blocks in Odisha to Mahanadi Coalfields Ltd,
Neyveli Lignite Corporation and HINDALCO.
2. Coal block allocations, including this one, are the subject of a CBI inquiry
which is being monitored by the Supreme Court. However, the Talabira
coal block allocation is a case where the final decision differed from the
earlier recommendation of the Screening Committee, and this was done following
a representation received in the Prime Minister`s Office from one of the
parties, which was referred to the Ministry of Coal.
3. The Prime Minister is satisfied that the final decision taken in this regard
was entirely appropriate and is based on the merits of the case placed before
him.
4. The details of the processing at different stages of the
decision making are summarized in the Annexure to clarify the position.
5. It is recognized that this allocation is subject to an ongoing
investigation. No impediment is being placed on the CBI to continue the
investigation and seek fresh information which may have a bearing on the case.
6. The investigation on this and other matters must take their normal course
under the law.
Annexure
1. The Prime Minister received a letter dated 7.5.2005 from Shri Kumar Mangalam Birla
requesting allocation of Talabira-II coal block in Odisha to HINDALCO for its 650 MW captive power plant in
its Integrated Aluminium Project in Sambalpur District, Odisha and
for a 100 MW captive plant for the expansion of its Hirakud
Aluminium plant in Odisha.
The letter was acknowledged by the Prime Minister who noted on the letter–
“Please get a report from Coal Ministry”.
2. The Prime Minister’s Office forwarded the letter to the Ministry of Coal on
25.5.2005 requesting it to look into the matter and send a report.
3. Shri Kumar Mangalam
Birla submitted another letter to the Prime Minister on 17.6.2005 repeating the
request. This letter was linked to the earlier reference and sent to the
Ministry of Coal with a request to send their report on the matter.
4. In August 2005, Ministry of Coal sent its file on the matter to the Prime
Minister. In the file, it was mentioned that the Screening Committee had considered
three major contenders for allocation of Talabira-II
and decided to allocate this block to Neyveli Lignite
Corporation (NLC) as:
(i) adequate coal linkages had been provided to
HINDALCO from Mahanadi Coalfields Ltd. (MCL) a long time back and HINDALCO had
not used the coal,
(ii) Talabira-II & III blocks needed to be
developed together to extract an additional 30 million tonnes
of coal which would have gone waste otherwise at the boundaries of each block,
(Talabira-III is a coal block which had been
separately allocated to Mahanadi Coalfields Ltd.) and
(iii) NLC & Mahanadi Coalfields Ltd. can develop the two blocks together as
one large mine through a Joint Venture (JV).
Shri Kumar Mangalam Birla
had requested for allocation of Talabira-II to HINDALCO
as:
(i) HINDALCO was the first applicant for it as long
back as 1996,
(ii) the coal linkage granted earlier was not used as a bauxite mine lease
relating to the aluminium plant had not materialized,
(iii) in view of the current shortage of coal, Mahanadi Coalfields Ltd. will
not be able to supply coal as per the earlier linkage, and
(iv) the Government of Odisha favoured
allocation of Talabira-II to HINDALCO in preference
to NLC.
5. While the file was being processed in PMO, the Prime Minister received a
letter dated 17.8.2005 from the Chief Minister of Odisha
on the allotment of Talabira-II to HINDALCO. The CM’s
letter mentioned that the State Government had assigned topmost priority to the
allocation of Talabira-II to HINDALCO and had strongly
supported the case in the Steering Committee meeting. The letter mentioned that
aluminium plants should get higher priority over
independent power plants as they generate more employment, create more wealth
for the country and add to the growth of the manufacturing sector directly.
Further, it stated that it is equitable to accord higher priority to units
adding more value through manufacturing within the state where the coal mine is
located. The letter urged that these special considerations be kept in mind and
the matter examined expeditiously.
6. On 29.8.2005, the Ministry of Coal file on the matter was returned with the
comment that while the file was being processed, a letter was received from
Chief Minister, Odisha and the Ministry of Coal may please
take this letter of CM, Odisha on record, re-examine
the matter in light thereof and resubmit the file.
7. Ministry of Coal resubmitted the file on 16.9.2005 with the proposal that
i) Talabira II & III be
mined as a single mine with the mining done by a JV formed between MCL, NLC
& HINDALCO.
ii) The shareholding of the JV between MCL:NLC:HINDALCO
to be 70:15:15.
iii) Mahanadi Coalfields Ltd’s equity shareholding of 70% would approximately
equal Talabira-III’s extractable reserves as a
proportion of the total of the two blocks. Under the sharing arrangement, 70%
of the total annual production will be handed over to Mahanadi Coalfields Ltd.
iv) The remaining 30% of the annual production will be
shared equally between HINDALCO and NLC with each getting 15%.
v) The satisfaction level of NLC would be 29% of its total requirement and of
HINDALCO, 81.5%.
8. The reasoning given by the Ministry of Coal was that:
i) Talabira-II & III
combined have reserves of 553 million tonnes.
ii) The total requirement of coal from these blocks from the three main
contenders is 503 million tonnes, with NLC seeking
280 million tonnes, HINDALCO seeking 100 million tonnes and Orissa Sponge Iron Ltd (OSIL) seeking 123
million tonnes.
iii) Allocating the blocks to these three would leave little coal for Mahanadi
Coalfields Ltd.
iv) NLC may not be dropped as it is a Central PSU
already recommended by the Screening Committee. HINDALCO’s case for allocation
has been strongly recommended by the State Government and it has also been an
early applicant. OSIL can be accommodated elsewhere.
v) It was further brought out that the Government of Odisha
have indicated a clear preference for allotment of the block to HINDALCO in the
interest of creating more employment and growth of the manufacturing sector in
the state.
vi) It was also pointed out that while both HINDALCO and NLC get the same
amount of coal, HINDALCO’s satisfaction level is about 80%, whereas NLC’s is
much lower.. However, as NLC and Mahanadi Coalfields Ltd. are proposing to set
up a JV power plant from the coal available from Talabira-II
& III, NLC’s full requirements could be met from Mahanadi Coalfields Ltd’s
reserves in Talabira-III. This would fully meet the
coal requirement of the two CPSUs to set up their power project and protect the
interests of the CPSUs.
9. While processing this proposal in PMO, it was noted that the ownership ratio
in the JV ownership was not in congruence with the guidelines approved by PM on
09.06.2005 which required this ratio to be in proportion to the assessed
requirement of coal of each allocatee. As per this
guideline, the NLC:HINDALCO ratio in their 30% share
should be 22.5:7.5 and not 15:15 as was proposed.
10. While recommending the case to the Prime Minister, it was clearly brought
out that:
i) The State Government of Odisha
has strongly recommended allocation of Talabira-II to
HINDALCO and supported it in the Screening Committee. Chief Minister, Odisha had reiterated this position assigning topmost
priority to the allocation of Talabira-II in favour of HINDALCO.
ii) Under the MMDR Act, the mining lease for coal is granted by the State
Government with the previous approval of the Central Government. Thus, under
the federal framework of sharing mining rights as provided under the Act, both
the Central and State Governments need to concur before an allocatee
can be granted a mining lease. Accordingly, the strong recommendation of the
Government of Odisha is important and has to be given
due consideration while taking a decision in the matter.
iii) The Ministry’s suggestion for allocation of 30% share of production in the
JV for Talabira-II & III combined to NLC &
HINDALCO, with the remaining 70% of the total production taken by MCL has merit
and may therefore be considered for acceptance.
iv) As for the NLC:HINDALCO equity ratio in the JV, this would require
relaxation of guidelines that were approved by PM earlier, but this could be
considered as NLC and Mahanadi Coalfields Ltd. are sister PSUs and NLC’s
requirements of coal could be met from Mahanadi Coalfields Ltd’s 70% share of
production. This would fully meet the coal requirement of the two CPSUs to set
up their power project and protect the interests of the CPSUs.
11. Based on these arguments, and also on the reasoning of the Ministry, it was
proposed that Prime Minister may approve:
i) Allocation of Talabira-II
& III to a JV owned jointly by MCL:NLC:HINDALCO in
the ratio 70:15:15 with the other aspects as proposed by the Ministry.
ii) The existing long term coal linkage of HINDALCO may be reviewed and
suitably reduced after taking into account HINDALCO’s requirement of coal for
the project and the share of HINDALCO in the coal mined by the JV in Talabira-II & III.
12. The Prime Minister approved the proposal on 1.10.2005.
***
NK