The
Government has formulated various schemes for reforms in power sector in the
country. This was stated by Sh. Piyush Goyal, Minister of state for Power,
Coal & New and Renewable Energy (Independent Charge) in a written reply to
a question in the Rajya Sabha today.
The Schemes launched for betterment and reforms in power sector are
as follows :
1.
Restructured Accelerated Power Development
Programme (R-APDRP):
Re-structured
APDRP was approved as Central Sector Scheme on 31.07. 2008 with total
outlay of Rs. 51,577 crores for IT enablement & strengthening of
distributions sector. The focus of the programme is urban areas – towns and
cities with population of more than 30,000 (10,000 for special category
states).
Projects under the scheme are taken up in two parts. Part-A is for
establishing IT enabled system for energy accounting / auditing and SCADA for
big cities (population: 4 lacs and Annual Energy Input: 350MU) whereas Part-B
is for regular distribution up-gradation & strengthening projects.
Initially funds for projects under both the parts would be provided through
loan. The entire amount of loan for Part-A projects would be converted into
grant on the completion of the project and up-to 50% (90% for special category
States) loan of Part-B projects would be converted into grant on achieving the
15% AT&C loss in the project area on a sustainable basis. The completion
period for both Part-A and Part-B projects are five years from the sanction
date.
Projects worth Rs.39,252 crores covering 1412 towns have been sanctioned
under the programme and are at various level of implementation.
2.
National Electricity Fund (NEF):
Government of India launched the National Electricity Fund (Interest
Subsidy Scheme) in July, 2012 to provide Interest Subsidy on loans raised by
both Public & Private Distribution Companies (Discoms), for capital works
sanctioned by financial institutions to improve the infrastructure in
Distribution Sector during the FY 2012-13 & 2013-14. The National
Electricity Fund would provide interest subsidy aggregating Rs.8,466 crores
spread over 14 years of loan disbursement amounting to Rs.25,000 crores for
Distribution Schemes sanctioned during the 2 years viz., 2012-13 &
2013-14. The pre-conditions for eligibility are linked to reform measures taken
by the States and the amount of interest subsidy is linked to the progress
achieved in reforms link parameters.
3.
FINANCIAL RESTRUCTURING PLAN (FRP):
The scheme for Financial Restructuring of State owned Discoms was
notified by Ministry of Power vide OM dated 05-10-2012 after CCEA approval to
enable the turnaround of the State Discoms and ensure their long term
viability. The scheme contains measures to be taken by the State Discoms and
State Government for achieving financial turnaround by restructuring their debt
with support through a Transitional Finance Mechanism by Central Government.
Central Government provides incentive by way of grant equal to the
value of the additional energy saved by way of accelerated AT&C loss
reduction beyond the loss trajectory specified under RAPDRP and capital
reimbursement support of 25% of principal repayment by the State Government on
the liability taken over by the State Government under the scheme. Bonds
amounting to Rs.56,908 crores have been issued by the Discoms and STL amounting
to Rs.51,204 Crores have been rescheduled by lenders in the participating
states.
4.
Ultra Mega Power Projects (UMPPs):
Ministry of Power launched an initiative in 2005-06 to facilitate
the development of Ultra Mega Power Projects (UMPPs) each having a capacity of
4,000 MW and above, at both the coal pitheads and coastal locations. These
projects are awarded to developers selected through international competitive
bidding process by following the Guidelines notified by Ministry of Power, GoI under
section 63 of the Electricity Act, 2003. Four UMPPs (Sasan, Mundra,
Krishnapatnam and Tilaiya) have been awarded so far to developers.
The entire investment in the projects is to be
made by the developers and no funds of Government are involved in the
development of these projects.
5.
Independent Transmission Projects (ITPs):
Ministry of Power has initiated a scheme for development of
Independent Transmission Projects (ITPs) through private sector participation
for evacuation of power from the Generating Stations, Transmission of power
from pooling stations to other grid stations up to load centers and system
strengthening in India under tariff based competitive bidding route under
Section-63 of the Electricity Act, 2003. For the development of ITPs, PFC
Consulting Limited (PFCCL) and REC Transmission Projects Company Ltd (RECTPL)
have been appointed as ‘Bid Process Coordinator’ by Ministry of Power, Govt. of
India.
The entire investment in the projects is to be made by the
developers and no funds of Government are involved in the development of these
projects.
6. Integrated
Power Development Scheme (IPDS):
The
Government has approved the Scheme of
“Integrated Power Development Scheme" (IPDS) with the objectives of:
1. Strengthening of sub-transmission and distribution network in the urban
areas;
2. Metering of distribution transformers /feeders / consumers
in the urban areas.
3. IT enablement of distribution sector and strengthening of
distribution network as per CCEA approval dated 21.06.2013 for completion of
targets laid down under Restructured Accelerated Power Development and Reforms
Programme (RAPDRP) for 12th and 13th Plans by carrying forward the approved
outlay for RAPDRP to IPDS.
The scheme will help in reduction in AT&C losses, establishment of IT
enabled energy accounting / auditing system, improvement in billed energy based
on metered consumption and improvement in collection efficiency.
The estimated cost of the present scheme with the components of strengthening
of sub-transmission and distribution networks, including metering of consumers
in the urban areas is Rs. 32,612 crore which includes the requirement of
budgetary support from Government of India of Rs. 25,354 crore over the entire
implementation period.
The component of IT enablement of distribution sector and strengthening of
distribution network approved by CCEA in June, 2013 in the form of RAPDRP for
12th and 13th Plans is subsumed in this scheme and CCEA-approved scheme outlay
of Rs.44,011 crore including a budgetary support of Rs. 22,727 crore is be
carried over to the new scheme of IPDS.
7.
Deendayal Upadhyaya Gram Jyoti Yojana(DDUGJY):
The Government has approved the Scheme of “Deendayal Upadhyaya Gram Jyoti Yojana (DDUGJY)“ with
components (i) to separate agriculture and non agriculture feeders facilitating
judicious roistering of supply to agricultural and non-agricultural consumers
in rural areas and (ii) strengthening and augmentation of sub transmission and
distribution infrastructure in rural areas, including metering of distribution
transformers/feeders/consumers.
The estimated cost of the scheme for above two components is Rs.43,033
crore which includes the requirement of budgetary support of Rs.33,453 crore
from Government of India over the entire implementation period. In addition to
this, the ongoing scheme of RGGVY in 12th and 13th Plans is subsumed in DDUGJY
as a distinct component for rural electrification, for which Government has
already approved to carry forward the balance amount of Rs.29,574 crore.
RM/RS – USQ 867-RS