The Minister of State (I/C) for Petroleum & Natural
Gas Shri Dharmendra Pradhan informed the Lok Sabha in a written reply today that
the details of existing natural gas pipelines along
with their capacity to transport the gas is enclosed as Annexure-I.
In order to complete the gas grid across the country, about 11,900 km of
pipelines have already been authorized by Petroleum & Natural Gas
Regulatory Board (PNGRB)/Government of India and 1200 km of pipeline is under
bidding process by PNGRB. For completion of gas grid, 2500 km of pipelines
have been identified for development through PPP mode.
Presently,
there is no proposal with PNGRB for setting up a National Gas Pipeline
Authority.
The details of the Bhatinda-Jammu-Srinagar and Jagdishpur-Haldia pipeline
projects along with the current status is enclosed at Annexure-II.
The onus for arranging of funds for laying of natural gas pipelines vests
with the entity authorized by PNGRB/Government.
For working out the implementation of the Budget announcement, Ministry has
identified various pipelines and spur line pipeline sections to be developed
to complete the National Gas Grid. Further, Ministry has identified 3
pipeline sections of the total length of about 2500 km for implementation
through PPP mode with Viability Gap Funding (VGF). Ministry has approved a
pipeline section (Ranchi-Talcher-Paradip) for implementation through PPP mode
as pilot project and the remaining 2 pipeline sections viz.,
Barauni-Guwahati-Agartala and Haldia-Paradip/Srikakulam would be considered
through PPP mode with VGF after successful completion of the pilot project.
The details of natural gas pipelines that would form part of the National Gas
Grid along with their present status are enclosed at Annexure-II.
ANNEXURE-I
REFERRED IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 1968
ANSWERED ON 09.03.2015 REGARDING NATIONAL GAS PIPELINE AUTHORITY
Details
of existing natural gas pipelines
|
S.No.
|
Name of the Natural
Gas pipeline
|
Length (KM)
|
System Capacity
(MMSCMD)
|
|
1.
|
Hazira-Vijaipur-Jagdishpur-GREP
(Gas Rehabilitation and Expansion Project)-Dahej-Vijaipur
|
4222
|
53
|
|
2.
|
Dahej-Vijaipur
(DVPL)-Vijaipur-Dadri (GREP) Upgradation
|
1280
|
54
|
|
3.
|
Uran-Trombay
|
24
|
6
|
|
4.
|
Dahej-Uran-Panvel-Dabhol
|
815
|
19.9
|
|
5.
|
Agartala regional
network
|
55.4
|
2
|
|
6.
|
Mumbai regional
network
|
125
|
7
|
|
7.
|
Assam regional
network
|
8
|
2.5
|
|
8.
|
K.G. Basin network
|
878
|
16
|
|
9.
|
Gujarat regional
network
|
609
|
8.31
|
|
10.
|
Cauvery Basin
network
|
241
|
4.33
|
|
11.
|
Dukli-Maharajganj
pipeline
|
5.2
|
0.26
|
|
12.
|
EWPL
(Kakinada-Hyderabad-Uran-Ahmedabad)
|
1460
|
95
|
|
13.
|
GSPL’s High
Pressure Gujarat Gas Grid Network
|
2100
|
31
|
|
14.
|
GSPL’s Low Pressure
Gujarat Gas Grid Network
|
58
|
12
|
|
15.
|
Hazira-Ankleshwar
|
73
|
5.06
|
|
16.
|
Dadri-Panipat
|
132
|
9.5
|
|
17.
|
AGCL’s Assam
regional network
|
105
|
2.428
|
|
18.
|
Uran-Taloja
|
42
|
0.7
|
|
19.
|
Dadri-Bawana-Nangal
|
788
|
31
|
|
20.
|
Chhainsa-Jhajjar-Hissar
|
262
|
35
|
|
21.
|
Dabhol-Bangalore
|
1004
|
16
|
|
22.
|
Kochi-Koottanad-Bangalore-Mangalore
|
42
|
16
|
ANNEXURE-II
REFERRED IN REPLY TO PART (d) & (f) OF LOK SABHA UNSTARRED QUESTION NO.
1968 ANSWERED ON 09.03.2015 REGARDING NATIONAL GAS PIPELINE AUTHORITY
|
Sl
No.
|
Name of the pipeline
|
Name of the
authorised entity
|
Length
(in kms)
|
Status
|
|
1.
|
Jagdishpur-Phulpur-Haldia
|
GAIL
|
2050
|
Survey work to be
completed by March 2015.
|
|
2.
|
Shadol-Phulpur
pipeline
|
Reliance Gas
Pipelines Limited (RGPL)
|
312
|
Project progressing
as per schedule. Expected to be completed by July, 2016.
|
|
3.
|
Kakinada-Vizag-Srikakulam
|
Andhra Pradesh Gas
Distribution Corporation Limited (APGDCL)
|
391
|
Project progressing
as per schedule. Expected to be completed by July, 2017.
|
|
4.
|
Mallavaram-Bhopal-Bhilwara
via Vijaipur
|
GSPL India Transco
Limited (GITL)
|
2042
|
These projects were
to be completed by July, 2014. However, the projects have been delayed on
account of project clearances/legal cases and the absence of demand tie-ups
with customers.
|
|
5.
|
Mehsana-Bhatinda
|
GSPL India Gasnet
Limited (GIGL)
|
2052
|
|
6.
|
Bhatinda-Jammu-Srinagar
|
GSPL India Gasnet
Limited (GIGL)
|
725
|
|
7.
|
Surat-Paradip
|
GAIL
|
2112
|
Expected to be
completed by 2020.
|
|
8.
|
Ennore-Nellore
|
KEI-RSOS
|
430
|
Expected to be
completed by end of 2017.
|
|
9.
|
Ennore-Thiruvallur-Bengaluru-Puducherry-Nagapattinam-Madurai-Tuticorin
|
|
1175
|
PNGRB is under
process to grant authorization.
|
|
10.
|
Ranchi-Talcher-Paradip
|
|
520
|
MoP&NG has
identified GAIL as the “sponsoring authority” for implementing
Ranchi-Talcher-Paradip pipeline section on a pilot basis through PPP mode
with VGF. Route Reconnaisance survey work has been completed and DFR is
under preparation. The expected date of PPP agreement is December, 2015.
|
|
11.
|
Barauni-Guwahati-Agartala
|
|
1300
|
These two pipelines
projects would be considered through PPP mode with VGF after successful
implementation of the Ranchi-Talcher-Paradip pipeline project.
|
|
12.
|
Haldia-Pardip/Srikakulam
|
|
500/700
|
|
13.
|
Kochi-Koottanad-Mangalore
|
GAIL
|
1062
|
The completion of
this pipeline is contingent upon resolution of Right of Use (RoU)
acquisition in the State of Tamil Nadu and Kerala. Presently, the
construction work is on hold as matter is sub-judice before the Supreme
Court.
|
|
14.
|
Spur-lines to
Dadri-Bawana-Nangal
|
GAIL
|
100
|
Main trunk lines
have been commissioned. Spur lines are under construction.
|
|
15.
|
Spur lines to
Chhainsa-Jhajjar-Hissar
|
GAIL
|
193
|
|
16.
|
Spur lines to
Dabhol-Bangalore
|
GAIL
|
410
|
|