Sl No
|
Name of the Project
|
Length (km)
|
Cost (TPC in Crore)
|
|
NH(O)
Projects executed by State PWD
|
|
1
|
Widening with Paved
shoulders & Strengthening from Km.0.00 to 50.675 of NH-730A EPC MODE
|
50.675
|
164.54
|
|
2
|
Strengthening with
provision of paved shoulder in km. 0.00 to 46.470 of NH-96(330) EPC MODE
|
46.47
|
227.74
|
|
3
|
Widening &
strengthening from km.505.00 to 538.00 of NH-730 (EPC MODE)
|
33.00
|
207.88
|
|
4
|
Widening &
strengthening from km. 454.00 to 470.90, 474.00 to 484.00 of NH-730 EPC
MODE
|
26.90
|
138.44
|
|
5
|
Constn. for four laning of
Babatpur-Varanasi section of NH-56 (231) Km 263.00 to 280.25 (EPC MODE)
|
17.25
|
753.57
|
|
6
|
Construction
of Ring Road for Raebareli City (Phase -I) on Eastern side of NH 24B
|
17.927
|
302.73
|
|
7
|
Widening to
two lane with paved shoulder from Km.51.000 (50.675) to 105.500 of NH-730A on
EPC mode
|
54.43
|
298.33
|
|
|
Sub-total
A
|
246.652
|
2093.23
|
|
NHDP-IV
executed by state PWD
|
|
8
|
Barabanki to junction with
MDR 13 near Jarwal section of NH-28C in Uttar Pradesh km 0 to 43
|
42.45
|
358.47
|
|
9
|
Junction with MDR-13 near
Jarwal to Bahraich section of NH-28C in Uttar Pradesh km 43 to 93
|
50.49
|
337.58
|
|
10
|
Bahraich bypass to Rupaidha
section NH-28C in Uttar Pradesh km 99 to150
|
53.85
|
437.92
|
|
11
|
Sonouli to Gorakhpur
section of NH-29E in Uttar Pradesh km 0/0 to 80/0
|
81.412
|
569.34
|
|
12
|
Indo-Nepal Border to
Rudhauli section of NH-233 in Uttar Pradesh km 0/0 to 65/870
|
65.87
|
551.48
|
|
13
|
Rudhauli to Ghagra Bridge
section of NH-233 in Uttar Pradesh km 65/870 to 122/270
|
54.36
|
550.93
|
|
14
|
Four laning of Allahabad
to UP/MP Border section of NH-27
|
41.34
|
774.57
|
|
15
|
Gorakhpur bypass from
existing km 79.670 of NH-29E to existing km 251.700 of NH-28
|
18.25
|
531
|
|
|
Sub-total B
|
408.022
|
4111.29
|
|
NHDP-IV executed by NHAI
|
|
16
|
Construction
of 4-lane Varanasi Bypass connecting NH-29 and NH-56 (Phase-I) on EPC Mode.
|
16.550
|
261.00
|
|
17
|
4-laning of
Ghaghara Bridge to Varanasi section from km 121.800 to km 180.420 (Pkg-I) on
EPC Mode.
|
58.635
|
674.34
|
|
18
|
4-laning of
Ghaghara Bridge to Varanasi section from km 180.420 to km 240.340 (Pkg-II) on
EPC Mode.
|
59.947
|
741.00
|
|
19
|
4-laning of
Ghaghara Bridge to Varanasi section from km 240.340 to km 299.350 (Pkg-III)
on EPC Mode.
|
59.070
|
785.00
|
|
20
|
6
laning of Agra to Etawah Bypass section from km 199.660 to km 323.525 on BOT
(Toll)
|
124.520
|
1650.20
|
|
21
|
4-laning
of Sultanpur to Varanasi section of NH-56 from km 134.700 to km 205.000
(Design Ch. 209.230) (PKG-1) on EPC Mode.
|
74.53
|
986.000
|
|
22
|
4-laning
of Sultanpur to Varanasi section of NH-56 from km km 205.000 to km 263.000
(Design Ch. 272.590) (PKG-2) on EPC Mode.
|
63.36
|
806.000
|
|
23
|
6-lane
Eastern Peripheral Expressway around Delhi
|
135
|
3991.43
|
|
24
|
Construction
of Delhi – Meerut Expressway
|
45
|
849.32
|
|
|
Sub-total C
|
636.612
|
10744.29
|
|
|
Total (A+B+C)
|
1293.29
|
16948.81
|
|
Sl No
|
Name of the
proposal
|
|
Modified cost
by Ministry
|
|
1.
|
Widening and strengthening
OF Kairana-Khatauli road from Km.33.000 to 47.900 (MDR)
|
14.90
|
28.31
|
|
2.
|
Bhitaura- bahedi road
(ODR) from Km 1.000 to 42.800, comprising of widening and strengthening work
from 3.75 m to 7 m (two laning).
|
41.80
|
77.93
|
|
3.
|
Sishgarh-bahedi road(ODR)
from km 1 to 20, comprising of widening and strengthening work from 3.75 m to
7 m (two laning)
|
20.00
|
36.68
|
|
4
|
Widening and strengthening
of Baha-Udi road from Km.22 to 30
|
9.000
|
18.83
|
|
5
|
Widening and strengthening
of Udi-Chakarnagar-Bareh road
|
42.300
|
94.40
|
|
6
|
Widening and strengthening
of Barkheda-Daolatpur-Uganpur-Suhas road from Km 0.000 to 20.650
|
20.650
|
48.08
|
|
7
|
Strengthening of Gawan
-Anupshahar road from Km 0.000 to 9.390
|
9.390
|
12.24
|
|
8
|
Widening and strengthening
of Widening & Strengthening of Babrala-Anupshahar road from Km 0.00 to
Km 16.630
|
16.630
|
14.48
|
|
9
|
Widening &
Strengthening of Rajpura-Tikata-Bahjoi road from Km 0.00 to 24.800
|
24.800
|
36.32
|
|
10
|
Widening &
Strengthening of link road connecting Km 193 of NH-93 (Chandausi) via
Ata-Mauassu-Naglia ballu-Tharaisa Jai Singh up to Pawasa from Km 0.00 to
17.00
|
17.000
|
26.75
|
|
11
|
Widening &
Strengthening of road connecting Km 158 of Meerut Badaun road to Mithunpur
via Ghonsli raja (Km 0.00 to Km 11.850)
|
11.850
|
20.14
|
|
12
|
Widening &
Strengthening of link road from Sahaswan Nadha to Pathakpur via Ghari Khanpur
from Km. 0.00 to 8.000
|
8.000
|
14.84
|
|
13
|
Widening &
Strengthening of Kanth - Mishripur - Begampur - Karanpur - Rattupura -
Thakurdwara - Jaspur Road (KMBK road from Km 0.000 to 13.600, KRSJ road from
Km1.000 to 8.000, TR road from Km 1.000 to 8.000 and TJ road from Km 0.000 to
5.000).
|
33.700
|
67.80
|
|
14
|
Widening &
Strengthening of Dalpatpur - Aliganj from Km 0.000 to 42.000
|
42.000
|
64.27
|
|
15
|
Widening &
Strengthening of Bisalpur - Bilsanda Gola road from Km 1.580to 21.000.
|
19.580
|
21.78
|
|
16
|
Widening &
Strengthening of Nawabganj - Dalelnagar- Vaharjagit- Barkheda road
( Barkheda-Nawabganj road) from Km 16.000 to 19.750
|
3.750
|
10.02
|
|
17
|
Widening of Bisauli- Aonla
road from Km.0.000 to 14.000
|
14.000
|
12.39
|
|
18
|
Widening &
Strengthening from Gandinagar Jamo road to Jodhnapur Madka via Barouliya
|
6.575
|
8.64
|
|
19
|
Strengthening of Jais -
Mohanganj road from Km 0.000 to 17.000
|
17.000
|
22.57
|
|
20
|
Strengthening of road from
Varisganj to Devkali Chauraha via Raniganj from Km 0.000 to 10.000) (
Varisganj-Shukulbazar-Subeha road)
|
10.000
|
11.09
|
|
21
|
Strengthening from road Km
2 of Sourikh-Daulatabad road to Behatarampur –Kairda Vishungad road (Km 0.00
to 10.00)
|
10.000
|
20.93
|
|
22
|
Widening &
Strengthening of Raebareli-Gurubakshganj-Kheri-Semri road from Km 5.800 to
Km to 42.300
|
36.500
|
68.52
|
|
23
|
Widening &
Strengthening of Lalganj-Semarpaha-Ralpur road Km 7.00 to 19.600
|
12.600
|
19.73
|
|
24
|
Widening &
Strengthening of remaining portion of Raebareli-Dalmau-Fatehpur road (Km 0.00
to Km 2.953)
|
2.953
|
3.12
|
|
25
|
Widening &
Strengthening of Dalmau-Jagatpur road from Km 3.600 to Km 26.000
|
22.400
|
35.65
|
|
26
|
Widening &
Strengthening of Jahanabad Richa road from Km. 0.00 to 10.000
|
10.000
|
14.62
|
|
27
|
Widening &
Strengthening of Puranpur Diyoriya Kalan road from Km. 30.00 to 44.720)
|
14.720
|
33.03
|
|
28
|
Widening &
Strengthening of Bareilly Bisalpur road from Km 26.000 to Km 40.800
|
14.800
|
27.97
|
|
29
|
Strengthening of
Bilraya-Panwari road from Km 288.00 to Km 311.650
|
23.650
|
36.53
|
|
30
|
Strengthening of
Muradganj-Ayana-Bijhalpur road (Km 0.00 to 10.00)
|
13.700
|
26.39
|
|
31
|
Widening &
Strengthening of Biswan-Laharpur-Hargaon road from Km 0.000 to Km 27.200
|
27.200
|
56.68
|
|
32
|
Widening &
Strengthening of Biswa – Mahmuda road from Km 0.000 to 24.830
|
24.830
|
56.39
|
|
33
|
Widening &
Strengthening of Lalitpur - Mehrauni road from Km 5.360 to 21.000 and from Km
35.500 to 42.000
|
22.140
|
41.48
|
|
34
|
Widening &
Strengthening of Jhansi-Unnao-Balaji road from Km 0.000 to 10.900, which
starts from Km 5 of NH-75
|
10.900
|
18.62
|
|
35
|
Widening &
Strengthening of Jalalpur- Rampur -Bhagan- Tarun Aahirouli road from Km
0.000 to 22.350
|
22.350
|
37.11
|
|
36
|
Widening &
Strengthening of Bisalpur Banda Puwayan Khutar road from Km 21.000 to 32.200
|
11.20
|
22.67
|
|
37
|
Widening &
Strengthening of Amroha ring road / bypass from Km 0.00 to Km 35.775
|
35.775
|
53.52
|
|
38
|
Widening &
Strengthening of Chunahar Jamui Aaharora road from Km 1.00 to 20.325
|
19.025
|
43.65
|
|
39
|
Widening and strengthening
of Nawabganj - Dalelnagar-Baherjageer road from Km 0.000 to 16.000
|
16.000
|
27.82
|
|
40
|
Widening and strengthening
of Inayatpur - Ghopa (Fulaona) link road
|
12.200
|
10.47
|
|
41
|
Widening and strengthening
of Birsingh – Halapur link road
|
17.050
|
18.90
|
|
42
|
Widening and strengthening
of road in Lambua via Kothra Hagiganj, Rajumari to Tatomureni from Km. 0.00
to 15.500
|
15.500
|
23.60
|
|
43
|
Widening and Strengthening
from Aligarh Ramghat road to Gaonkheda Godha CTK road from Km 0.00 to Km
15.300
|
15.300
|
29.44
|
|
44
|
Strengthening &
widening of Vidhnu-Kisan Nagar Nehar Patri road from Km 1.000 to 18.600
|
17.600
|
24.67
|
|
45
|
Wideing and Strengthening
of Chibramau-Kairda road Km.0.000 to 9.800
|
9.800
|
21.26
|
|
46
|
Widening and Strengthening
of Lalitpur - Devgarh road from Km 0.000 to 32.300
|
32.300
|
53.77
|
|
47
|
Widening and Strengthening
of Jakhora - Rajghat road from Km 0.000 to 19.000
|
19.000
|
35.31
|
|
48
|
Widening and Strengthening
of Lalitpur - Rajghat road from Km 0.000 to 21.560
|
21.560
|
37.82
|
|
49
|
Widening and Strengthening
of Karahi to Pathra via Goura-Tigodwa from Km 0.000 to 9.000
|
9.00
|
4.13
|
|
50
|
Widening and Strengthening
of Baansi Ganguli Chauraha to Gothwa Ghat via Piperhiya from Km 0.000 to
5.000
|
5.000
|
2.36
|
|
51
|
Strengthening of Chilaha-
Gopiganj road Km 0.00 to 10.40
|
10.400
|
14.31
|
|
52
|
Widening &
Strengthening of link road connecting NH-509 at Narora via Jamuna singh
road-Ishampur-Asadpur-Dabathra with State Road 18 (Junawa) (Km 0.00 to
13.100)
|
13.100
|
23.94
|
|
53
|
Widening and Strengthening
of Gorakhpur- Pipraich- Kaptanganj road from Km 0.000 to 19.485
|
19.485
|
36.78
|
|
54
|
Widening and Strengthening
of Sahajanwan - Bakhira road from Km 0.000 to 23.200
|
23.200
|
60.02
|
|
55
|
Pipiganj - Jasval - Sisai
- Sahjanwan road from Km 0.000 to 20.200
|
20.200
|
28.36
|
|
56
|
Four laning of interna
lportion of old NH-2 from Km 161.800 to 180.000 (Kokhraj to Manauri)
|
18.200
|
127.32
|
|
57
|
Strengthening of city
protionof old NH-93 handed over to State PWD from Umed to Nagla Bhus from Km
0.000 to 10.635
|
10.635
|
20.86
|
|
58
|
Widening and Strengthening
of Agra-Jalesar-Sikandramau road from Km 62.000 to 74.4000
|
10.700
|
18.06
|
|
59
|
Widening and Strengthening
of Bhojubir-Sindhora road from Km 2.00 to 23.200
|
21.200
|
46.77
|
|
60
|
Widening and Strengthening
of link road connecting NH-11 to NH-2 at (Achnera Deen Dayal Dham Farah road)
Kirvali-Achnera-(Km 4.65
to 6.65)
Achnera-Zhundavai (Km 0.00
to Km 1.70)
Achnera-Farah (Km 0.00 to
Km 1.70 & Km 1.70 to Km 9.025)
Farah-Achnera (Km 0.60 to
Km 8.20)
Farah-Shonkh (Km 0.00 to
0.60)
|
20.925
|
41.44
|
|
61
|
Widening &
Strengthening of Mau to Mohmmadabad road via Yousufpur (Km 0.00 to Km
10.000)
|
10.000
|
24.70
|
|
62
|
Widening of BTIB to Mahowa
Dhobha Shahapur road (Km 0.000 to Km 18.000
|
18.000
|
27.25
|
|
63
|
Widening &
Strengthening of Shoharatgarh to Palta Devi lin road via Ramwapur Chouraha
|
5.000
|
2.12
|
|
64
|
Widening &
Strengthening of Jaunpur-Malhani-Khuthan road (Km 0.00 to Km 27.150)
|
27.150
|
32.02
|
|
65
|
Widening &
Strengthening of Kundaha-Sujanganj-MachliShehar-Madiyahoo-Jalalpur-Kerakat-Sultanpur
road (Km 0.00 to 27.080 & Km 87.500 to 96.200)
|
36.080
|
45.98
|
|
66
|
Widening &
Strengthening of Jivli -Devgaon -Mehnajpur -Aodiyar road (Km 18.440 to Km
33.500)
|
15.060
|
15.23
|
|
67
|
Widening &
Strengthening of road from Babatpur-Chaubepur-Bhagtua-Balua bridge (Km.
32.340 to 61.13)
|
39.350
|
93.28
|
|
68
|
Widening &
Strengthening of Baburi-Dharauli road (Km 0.00 to 15.00)
|
15.000
|
34.60
|
|
69
|
Widening &
Strengthening of Chahaniya-Dhanapur-Mahuji-Jamaniya road
|
42.000
|
76.59
|
|
70
|
Widening &
Strengthening of Lalapur Imliya Kanjasa Bhita road (Km 0.00 to Km 23.600)
|
23.600
|
32.66
|
|
71
|
Widening &
Strengthening of Pailani-Galauli-Bara road (Km 0.00 to 15.00)
|
15.000
|
27.52
|
|
72
|
Widening &
Strengthening of Kaptanganj-Siswan-Nichlaul-Thuthiwari-Nautanwa
|
73.000
|
189.89
|
|
73
|
Widening &
Strengthening of Aligarh to Gonda road (Km 0.00 to Km 18.200
|
16.200
|
27.01
|
|
74
|
Widening &
Strengthening of Gazi ka bagh Mubarakpur link road (Km 0.00 to Km 13.600)
|
13.600
|
17.97
|
|
75
|
Widening &
Strengthening of SMK road to lutar khaur bhaiyya Laxman ka Pura-Meja-Bhatauti
road (Km 0.000 to Km 19.250)
|
19.25
|
44.54
|
|
76
|
Widening &
Strengthening Delhupur-Raniganj-Patti Kohdaur road (Km 0.000 to Km 61.000)
|
61.00
|
117.64
|
|
|
Sub-total
|
1505.313
|
2780.58
|
|
|
ISC Works
|
|
|
|
1
|
Widening of existing
single lane carriageway to two lanes with Strengthening from Km.0.00 to Km
49.00of LalganjHaliyaAndawaManigaraha Road (ODR) upto Madhya Pradesh Border
|
49.00
|
98.97
|
|
2
|
Widening of existing
single lane carriageway to two lanes Km. 2.50 to Km 36.24 and with two lane
paved shoulder from Km. 0.00 to Km 2.50 with Strengthening from Km.0.00 to Km
36.24 of Chopan to MP Border
Road (ODR)
|
36.24
|
96.05
|
|
3
|
Widening of existing carriageway
to two lanes with paved shoulder with Strengthening from Km.0.00 to Km 15.43
of BhabniPokharaAasandeeh
Road (ODR) of Distt. Sonebhadrain
|
15.43
|
59.42
|
|
|
Sub-total
|
100.67
|
254.44
|
|
|
Total
|
1706.653
|
3035
|
|
Sl. No.
|
Name of
Highway / road
|
Length in
U.P. (in Kms)
|
|
1
|
Allahabad-Jaunpur-Gorakhpur
|
170.00
|
|
2
|
Panipat- Haryan / UP border -
Shamli-Muzaffarnagar-Bijnor-Nagina
|
131.00
|
|
3
|
Delhi- Saharanpur
|
170.00
|
|
4
|
Ghaziabad-Noida-Faridabad-Sohna (Total length= 75
km; Haryana= 57 km; UP= 18 km)
|
18.00
|
|
5
|
Nuh-Mandkola-Palwal-Jewar-Bulandshahar (Total
length= 60 km; Haryana= 52 km; UP= 8 km)
|
8.00
|
|
6
|
Palwal-Aligarh (Total length= 83 km; Haryana= 17 km;
UP= 66 km)
|
66.00
|
|
7
|
Faridabad (Kheri
Bridge)-Jasana-Cheersi-Manjhawali-Atta Gujaran-Dankor-Yamuna Expressway
(Total length= 25 km; Haryana= 17 km; UP= 8 km)
|
8.00
|
|
8
|
Guna- Ashok Nagar – Thuban- Piprod- Chanderi – MP/UP
Border near Rajgahtdam - Lalitpur – intersecting N-S
corridor-Panari-Rajwara-Banpur(MP/UP boredr)-Tikamgarh intersecting NH-539
(Total length = 295; MP= 240; UP= 55)
|
55.00
|
|
9
|
Nagod- Kanijar- Narayani terminating at junction
with NH- 35 between Banda and Chitrakut (Total length = 87 km; MP= 56 km; UP=
31 km)
|
31.00
|
|
10
|
Stretch from Bareilly (junction at NH-30 near Civil
Lines)- Bhutah –Bisalpur
|
36.00
|
|
11
|
Stretch from Bewar (on NH-34) Fatehgarh-Miranpur
Katra (on NH-30) Bisalpur (on NH-370)-Pillibhit on NH-730
|
191.00
|
|
12
|
Stretch from Nawalpur–Ubhaon crossing- Sikandrapur-Maniar-Bansdih-Reoti-junction
with NH-31
|
108.00
|
|
13
|
Stretch from Allahabad
–Koraon-Drumanodganj-Haliya-Awadhadam-Pipra-Manigarha- UP /MP border- Karondiya-Bagdara-Chatrangi-Singrauli extended up to junction on
NH-39 in Madhya Pradesh near Waidhan (Total=176 km,U.P=104 km, M.P= 72km)
|
104.00
|
|
14
|
Stretch from Karmaini (junction on NH-24 near
Compierganj)-Menhdalwal Kahliabad- Dhanghata- Ramnagar- Nyori (junction on
NH-28- Azamgarh
|
105.00
|
|
15
|
Stretch form Agra (junction on NH-509 near Islam
Nagar-Jalesar-Etah (junction on NH-34 near Police line)
|
79.00
|
|
16
|
Stretch from Balia (junction on NH-31 nearTeekha )-
Mau-Azamgarh on NH-28
|
100.00
|
|
17
|
Stretch from Jaunpur to Khuthan extended upto NH-31
near Saidpur
|
60.00
|
|
18
|
Stretch from Palia Shajahanpur via Hardoi –Lucknow
|
270.00
|
|
19
|
Stretch from Mathura (NH-44) Hathras-Badaun-Bareilly
(NH-30)
|
215.00
|
|
20
|
Stretch from Moradabad- UP / Uttrakhand border- Jaspur-Kashipur (Total=58km,U.P=53km, Uttarakhand=5km,)
|
53.00
|
|
21
|
Saidpur- Sadat- Jakhania- Jalalabad mor- Mardah
|
50.00
|
|
22
|
Tarighat- Bara- Buxar(Uttarpradesh= 38.20 km;
Bihar=10.80 Km)
|
38.20
|
|
23
|
Akbarpur-Baskhari
|
23.00
|
|
24
|
Muzzafarnagar-Jansath-Miranpur
on NH 34
|
40.00
|
|
25
|
Khurja on NH 34-Jewar
|
34.00
|
|
26
|
Meerut-Garhmukteshwar (junction
at NH 9)
|
47.00
|
|
27
|
Sikandarpur-Ballia
|
35.00
|
|
28
|
Jalesar-junction with NH 34 near
Sinkandara Rao
|
25.00
|
|
29
|
Gorakhpur (junction at NH
27)-Paratawal
|
32.00
|
|
30
|
Maharajganj-Nichlaul-Thuthibari
road (upto Nepal border)
|
39.00
|
|
31
|
Basti-Mehdawal-Kaptanganj
|
92.00
|
|
32
|
Faizalnagar-Tamkuhi-extended
upto Salempur on NH 727A
|
52.00
|
|
33
|
Salemgarh-Sewarhi-Padrauna
|
49.00
|
|
34
|
Zamania-Gehmar
|
21.00
|
|
35
|
Tamkuhira (NH 28)-Betia (NH 28B)
|
36.00
|
|
|
Total
|
2591.20
|