- Under Economic Corridor
|
|
|
Length
(in Km.)
|
Status
|
|
Madanapalli –Pileru Section of NH-71
|
54.86
|
DPR in progress
|
|
Pileru – Cherlopalli Section of NH-71
|
50.94
|
DPR in progress
|
|
Renigunta to Poyya section of NH-71
|
55.2
|
DPR in progress
|
|
Kadapa - Renigunta (NH-40) (Chennai - Puttur - Kadapa - Nandyal - Kurnool)
|
138
|
DPR in progress
|
|
AP / KN Border - Alur - Adoni section of Hasan - Raichur
|
83.89
|
DPR in progress
|
|
Visakhapatnam – Raipur Section:
Developmental works of NH-26 from Ondarangi – Vizianagaramin the state of Andhra Pradesh (Visakhapatnam – Raipur section).
|
70
|
DPR in progress
|
|
Sub Total
|
247.00
|
|
|
B. Under Inter Corridor Routes
|
|
|
|
Mydukur – Badvel section of NH – 67
|
41
|
DPR in progress
|
|
Badvel – Nellore
|
106.77
|
DPR in progress
|
|
Sub Total
|
147.77
|
|
|
C. Under NHAI / NH (O)
|
|
|
|
DPR for upgradation of the highway starting from junction with NH-44 at Anantapur – Giddalur of NH 544D in the State of Andhra Pradesh to Two / Four lane with paved shoulder configuration (Pkg-I & II)
|
139.00
|
DPR in progress
|
|
Two lane with paved shoulder of Anantapur – Giddalur of NH 544D (Pkg-III) (Bugga to Kaipa)
|
57.400
|
Bids Invited
|
|
Two lane with paved shoulder of Anantapur – Giddalur of NH 544D (Pkg-IV) (Kaipa to Giddalur)
|
77.569
|
Bids Invited
|
|
DPR for upgradation of the highway starting Giddalur to Guntur of NH 544D (Vinukonda – Guntur) in the State of Andhra Pradesh to Two / Four lane with paved shoulder configuration
|
83.00
|
DPR in progress
|
|
DPR for Upgradation of Kurnool – Dornala section of NH-340C to Two/Four lane with paved shoulder configuration
|
124.15
|
DPR in progress
|
|
Sub Total
|
481.119
|
|
|
D. Ring Roads
|
|
|
|
6-laning of Chilakaluripet Bypass on NH-16 under NHDP Phase-V on BOT(Toll)
|
16.384
|
DPR in progress
|
|
Feasibility Study Report for Construction of Outer Ring Road around Vijayawada – Guntur – Tenali Urban Agglomeration in the States of Andhra Pradesh on Green Field Alignment under NHDP Phase-VII
|
189
|
DPR in progress
|
|
Sub Total
|
205.384
|
|
|
E Costal Roads
|
|
|
|
Kathipudi – Ongole stretch of NH-216 (2l+PS/4L)
|
363
|
Work in progress in 9 packages
|
|
Sub Total
|
363
|
|
|
F Residual Works in NHDP
|
|
|
|
Davulapally – Markapuram – Vagampalli – Dornala and Penchalkona – Yerpedu section of NH 565 (2L+PS) (Implemented in 4 packages)
|
287
|
Work completed
|
|
Mydukur – Nellore section of NH-67 (Implemented in 3 packages) (2L+PS)
|
149.5
|
Work completed
|
|
Ibrahimpatnam – Chandragudem and Chandragudem-A.P Telangana border section of NH 221 (Implemented in 2 packages) (2L+PS)
|
70.3
|
Work completed
|
|
Dornala – Penchalakona section of Nh-565 (2L+PS)
|
42
|
Work in progress
|
|
Karnataka/AP Border-Gooty section of NH-67 (4L)
|
57
|
Work in progress
|
|
Nagarjunsagar Dam- Davulpally section of NH-565
|
47
|
DPR complete
|
|
Davulpally reserve forest section of NH-565
|
22
|
DPR in progress
|
|
Sub Total
|
674.8
|
|
|
G Connectivity of Backward districts and Religious and Tourist centres
|
|
|
|
Malkangiri on NH 326- Chintapalle-Naripattanam – Waddai - Chodavaram-Sabbavaram&Narsipatnam – Tuni section
|
280
|
DPR in progress
|
|
Route starting from NH-565 Gotlagattu – Podile – Uppalapadu – Chimakurti - Ongole on NH-16.
|
107
|
DPR in progress
|
|
Sub Total
|
387
|
|