Ministry of Power29-November, 2011 15:36 IST
Hydel Power Generation

 

BACKGROUNDER

 

 

The Central Electricity Authority (CEA) carried out re-assessment studies of hydro-electric potential of the country in 1987.  According to these studies, hydro power potential of the country in terms of Installed Capacity (IC) is estimated at 1,48,701 MW, out of which 1,45,320 MW of the potential consists of hydro-electric schemes having IC above 25 MW.  Of the above identified capacity, 33920.8 MW has so far been developed.  In addition, 4785.6 MW of Pumped Storage Schemes (PSS) are under operation.  The State-wise details are given below:

 

STATUS OF  HYDRO  ELECTRIC  POTENTIAL  DEVELOPMENT

( In terms of Installed capacity - Above 25 MW)

 As on 31.10.2011

Region/ State

Identified Capacity as per reassessment study

    Capacity

   Developed 

* Capacity               Under construction

 Capacity Developed +  Under Construction  

Capacity yet to be

       developed

   

Total

Above 25 MW

 

(MW)

(MW)

(MW)

%

(MW)

(%)

(MW)

(%)

(MW)

%

   NORTHERN

 

 

 

 

 

 

 

 

 

 

J&K

14146

13543

2340.0

17.28

1109.0

8.19

3449.0

25.47

10094.0

74.53

H.P

18820

18540

7293.0

39.34

3582.0

19.32

10875.0

58.66

7665.0

41.34

Punjab

971

971

1206.3

100.00

0.0

0.00

1206.3

100.00

0.0

0.00

Haryana

64

64

0.0

0.00

0.0

0.00

0.0

0.00

64.0

100.00

Rajasthan

496

483

411.0

85.09

0.0

0.00

411.0

85.09

72.0

14.91

Uttaranchal

18175

17998

3226.4

17.93

1225.0

6.81

4451.4

24.73

13546.7

75.27

Uttar Pradesh

723

664

501.6

75.54

0.0

0.00

501.6

75.54

162.4

24.46

Sub Total (NR)

53395

52263

14978.3

28.66

5916.0

11.32

20894.3

39.98

31368.8

60.02

   WESTERN

 

 

 

 

 

 

 

 

 

 

Madhya Pradesh

2243

1970

2395.0

100.00

400.0

20.30

2795.0

100.00

0.0

0.00

Chhattisgarh

2242

2202

120.0

5.45

0.0

0.00

120.0

5.45

2082.0

94.55

Gujarat

619

590

550.0

93.22

0.0

0.00

550.0

93.22

40.0

6.78

Maharashtra

3769

3314

2487.0

75.05

0.0

0.00

2487.0

75.05

827.0

24.95

Goa

55

55

0.0

0.00

0.0

0.00

0.0

0.00

55.0

100.00

Sub total (WR)

8928

8131

5552.0

68.28

400.0

4.92

5952.0

73.20

2179.0

26.80

   SOUTHERN

 

 

 

 

 

 

 

 

 

 

Andhra Pradesh

4424

4360

2177.8

49.95

410.0

9.40

2587.8

59.35

1772.3

40.65

Karnataka

6602

6459

3585.4

55.51

0.0

0.00

3585.4

55.51

2873.6

44.49

Kerala

3514

3378

1881.5

55.70

100.0

2.96

1981.5

58.66

1396.5

41.34

Tamil Nadu

1918

1693

1722.2

100.00

60.0

3.54

1782.2

100.00

0.0

0.00

Sub Total (SR)

16458

15890

9366.9

58.95

570.0

3.59

9936.9

62.54

5953.2

37.46

 

 EASTERN

 

 

 

 

 

 

 

 

 

 

Jharkhand

753

582

233.2

40.07

0.0

0.00

233.2

40.07

348.8

59.93

Bihar

70

40

0.0

 

0.0

0.00

0.0

 

40.0

100.00

Orissa

2999

2981

2027.5

68.01

0.0

0.00

2027.5

68.01

953.5

31.99

West Bengal

2841

2829

77.0

2.72

292.0

10.32

369.0

13.04

2460.0

86.96

Sikkim

4286

4248

570.0

13.42

2163.0

50.92

2733.0

64.34

1515.0

35.66

A& Nicobar

0

0

0.0

 

 

 

 

 

0.0

 

Sub Total (ER)

10949

10680

2907.7

27.23

2455.0

22.99

5362.7

50.21

5317.3

49.79

 NORTH EASTERN

 

 

 

 

 

 

 

 

Meghalaya

2394

2298

156.0

6.79

166.0

7.22

322.0

14.01

1976.0

85.99

Tripura

15

0

0.0

 

0.0

 

0.0

 

0.0

 

Manipur

1784

1761

105.0

5.96

0.0

0.00

105.0

5.96

1656.0

94.04

Assam

680

650

375.0

57.69

0.0

0.00

375.0

57.69

275.0

42.31

Nagaland

1574

1452

75.0

5.17

0.0

0.00

75.0

5.17

1377.0

94.83

Arunachal Pd

50328

50064

405.0

0.81

4460.0

8.91

4865.0

9.72

45199.0

90.28

Mizoram

2196

2131

0.0

0.00

60.0

2.82

60.0

2.82

2071.0

97.18

Sub Total (NER)

58971

58356

1116.0

1.91

4686.0

8.03

5802.0

9.94

52554.0

90.06

  ALL INDIA

148701

145320

33920.8

23.34

14027.0

9.65

47947.8

32.99

97372.2

67.01

Note : 1 In addition to above 2 PSS (1080 MW) are under construction and 4785.6 MW PSS are under operation.

 

At present, 50 Nos. of Hydro Electric Schemes with installed capacity of 15107 MW (including 2 PSS having installed capacity of 1080 MW) are under various stages of construction.  The details along with the commissioning schedule are given below:-

 

List of Hydro projects under execution

(Excluding projects under Ministry of New & Renewable Energy)

As on 15.11.2011

Sl.

No.

Name of Project

Unit

No.

State/

Implem. Agency

Capacity

(MW)

Likely

Commissioning

1

Parbati St. II

4x200= 800 MW

U-1 to

U-4

Himachal Pradesh/

NHPC

800

2014-15

2

Chamera-III

3x77= 231 MW

U-1 to

U-3 

Himachal Pradesh/

NHPC

231

2011-12

3

Parabati-III

4x130= 520 MW

U-1 to

U-4

Himachal Pradesh/

NHPC

520

2012-13

4

Kol Dam

4x200= 800 MW

U-1 to

U-4

Himachal Pradesh/

NTPC

800

2013-14

5

Rampur

6x68.67= 412 MW

U-1 to

U-6

Himachal Pradesh/ SJVNL

412

2013-14

6

Uri-II

4x60= 240 MW

U-1 to

U-4

Jammu & Kashmir/

NHPC

240

2011-12

7

Chutak

4x11=44 MW

U-1 to

U-4

Jammu & Kashmir/

NHPC

44

2011-12

8

NimooBazgo

3x15=45 MW

U-1 to

U-3

Jammu & Kashmir/

NHPC

45

2012-13

9

Koteshwar

4x100= 400 MW

U-1 to

U-4

Uttarakhand/

THDC

200

2011-12

 

10

TapovanVishnugad

4x130=520 MW

U-1 to

U-4

Uttarakhand /

NTPC

520

2014-15

11

Teesta Low Dam-III

4x33= 132 MW

U-1 to

U-4

West Bengal/

NHPC

132

2012-13

12

Teesta Low Dam-IV

4x40= 160 MW

U-1 to

U-4

West Bengal/

NHPC

160

2013-14

13

Subansiri Lower

8x250= 2000 MW

U-1 to

U-8

Arunachal Pradesh/

NHPC

2000

2013-15

14

Kameng

4x150= 600 MW

U-1 to

U-4

Arunachal Pradesh/

NEEPCO

600

2016-17

15

Uhl-III

3x33.33= 100 MW

U-1 to U-3

Himachal Pradesh/

Beas Valley Power Corp. Ltd. (BVPC)

100

2013-14

16

SwaraKuddu

3x36.6= 110 MW

U-1 to

U-3

Himachal Pradesh/

HPPCL

110

2013-14

17

Nagarujana Sagar TR

2x25= 50 MW

U-1 &

U-2

Andhra Pradesh/

APGENCO

50

2013-14

18

Lower Jurala

6x40= 240 MW

U-1 to

U-6

Andhra Pradesh/

APGENCO

240

 

2012-14

19

Pulichintala

4x30= 120 MW

U-1 to

U-4

Andhra Pradesh/

APGENCO

120

2012-14

20

Pallivasal

2x30= 60 MW

U-1 to

U-2

Kerala/

KSEB

60

2013-14

 

21

Bhawani Barrage II

2x15= 30 MW

U-1 &

U-2

Tamil Nadu/

TNEB

30

2011-12

22

Bhawani Barrage  III

2x15= 30 MW

U-1 &

U-2

Tamil Nadu/

TNEB

30

2012-13

 

23

Myntdu

3x42= 84 MW

U-1&

U-2

Meghalaya/

MeSEB

126

2011-12

24

New Umtru

2x20= 40 MW

U-1&

U-2

Meghalaya/

MeSEB

40

2013-14

25

Budhil

2x35= 70 MW

 U-1 &

U-2

Himachal Pradesh/

LANCO

70

2011-12

26

Sorang

2x50= 100 MW

U-1 &

U-2 

Himachal Pradesh/

Himachal Sorang Power

100

2012-13

27

Shrinagar

4x82.5= 330 MW

U-1 to

U- 4

Uttarakhand/

M/s GVK Industries

330

2012-13

28

Maheshwar

10x40= 400 MW

U-1 to U-10

Madhya Pradesh/

SMHPCL

400

2012-13

 

29

Chujachen

2x49.5= 99 MW

U-1&

U-2 

Sikkim/

Gati

99

2012-13

 

30

Teesta- III

6x200= 1200 MW

U-1 to

U-6

Sikkim/

TeestaUrja Ltd.

1200

2012-13

31

Tehri PSS

4x250= 1000 MW

U-1 to

U-4

Uttarakhand/

THDC

1000

2015-16

32

Kishanganga

3x110= 330 MW

U-1 to

U-3

Jammu & Kashmir/

NHPC

330

2016-17

33

Pare

2x55= 110 MW

U-1 to

U-2

Arunachal Pradesh/

NEEPCO

110

2014-15

34

Tuirial

2x30= 60 MW

U-1 to

U-2

Mizoram/

NEEPCO

60

2014-15

35

Baglihar-II*

3x150= 450 MW

U-1 to

U-3

J&K/

JKPDC

450

2015-16

36

Kashang-I

65 MW

 

Himachal Pradesh/ HPPCL

65

2013-14

37

Kashang-II & III

1x65 + 1x65= 130 MW

U- 1

U- 2

Himachal Pradesh/ HPPCL

130

2014-15

38

Sainj

100 MW

 

Himachal Pradesh/ HPPCL

100

2014-15

39

Koyna Left Bank PSS

2x40= 80 MW

U-1 to

U-2

Maharashtra/

WRD, GO Mah.

80

2014-15

40

Thottiyar

1x30 + 1x10= 40 MW

U-1 to

U-2

Kerala/

KSEB

40

2014-15

41

Tidong-I

2x50= 100 MW

U-1 to

U-2

Himachal Pradesh/

M/s Nuziveedu Seeds

100

2014-15

42

Tangu Romai- I

2x22= 44 MW

U-1 to

U-2

Himachal Pradesh/

TanguRomai Power Generation

44

2014-15

43

PhataByung

76 MW

 

Uttarakhand/

M/s Lanco

76

2013-14

44

SingoliBhatwari

3x33= 99 MW

U-1 to

U-3

Uttarakhand/

L&T Uttaranchal Hydro power Limited

99

2015-16

 

45

Teesta- VI

4x125= 500 MW

U-1 to

U-4

Sikkim/

LANCO

500

2013-14

46

Rangit-IV

3x40= 120 MW

U-1 to

U-3

Sikkim/

Jal Power corp. Ltd.

120

2013-14

47

Jorethang Loop

2x48= 96 MW

 

Sikkim/

M/s DANS Energy

96

2013-14

48

Bhasmey

3x17= 51 MW

U-1 to

U-3

Sikkim/

Gati Infrastructure

51

2014-15

49

Tashiding

2x48.5= 97 MW

U-1 to

U-2

Sikkim/

Shiga Energy Pvt. Ltd.

97

2014-15

50

Demwe Lower

5x342 + 1x40= 1750 MW

U-1 to

U-6

Arunachal Pradesh/

Athena Demwe Power

1750

2016-17

Total- Under Execution:

15107

 

 

*  Works allotted with Baglihar - I

Note:- Construction of Loharinagpala HEP (600 MW) by NTPC in Uttarakhand has been discontinued.

 

 

MA/VN