Year 1836
A small piece of rail-line
was laid near Chindadripet in Madras, now Chennai.
Year 1844
Active campaigning
for rail-lines near St. Petersburg.
Year 1849
East Indian Railway (EIR) Company and Great Indian Peninsula
Railway (GIP) Company granted financial guarantee for construction and operation
of rail-lines in India. Agreements signed.
Year 1850
Work on rail-lines began in East and West by
EIR and GIP Railway respectively.
Year 1853
First Railway line from Bombay to Thane was inaugurated on 16th April 1853 by GIP Railway.
Year 1854
First Railway line in East from Howrah to Hoogli
was inaugurated on 15th
August 1854
by EIR.
Year 1855
First Railway line in South from Veyasarpadi to Walajah Road opened for traffic on 1st July 1855 by Madras Railway.
Year 1866
Calcutta (Howrah) linked with Delhi and Bombay via Allahabad.
Year 1871
Metre Gauge was chosen
as second standard gauge for India.
Year 1872
First metre gauge
line from Delhi to Rewari inaugurated.
Year 1881
Darjeeling Himalayan Railway opens its line
to the hills.
Year 1887
Victoria Terminus – A new station building
and administrative offices of GIP Railway opened in Mumbai.
Year 1890
Indian Railways Act passed.
Year 1891
Toilets in third class coaches introduced.
Year 1895
First Indian built steam locomotive by Ajmer Workshop.
Year 1900
Welding process of Rails developed.
Year 1902
Indian Railway Conference Association set up.
Year 1903
Kalka-Shimla Railway
opens for traffic.
Year 1905
Railway Board assumes office.
Year 1924
Railway Board reconstituted with Chief Commissioner
as President and an ex-officio Secretary to Government of India and two Members.
Year 1930
Central Standards Office (CSO) under Chief
Controller of Standardisation set up to standardize
all equipments commonly in use on Railways.
Year 1936
Air-conditioning introduced in passenger coaches.
Year 1937
Post of Minister for Transport and Communication
created; Railway Board placed under the Ministry.
Year 1947
India is Independent, Indian Railways separated
into two different systems; India and Pakistan.
Year 1950
Production of steam locomotives started in
Chittaranjan Locomotive Works.
Year 1950 –Central Advisory Committee for Railways
approves regrouping of Indian Railways in to six Zonal systems.
Year 1951
Formation
of Southern, Western and Central Railways.
Year 1952
Railway Staff College, Vadodara
set up.
Integral Coach Factory (ICF), Madras set up as a production unit for all
welded steel, light weight integral coaches.
Formation
of Eastern, Northern and North Eastern Railways.
Year 1954
Position of Chief Commissioner for Railways
renamed as Chairman, Railway Board.
Year 1955
Indian Railways Institute for Civil Engineering
(IRICEN) at Pune set up.
South Eastern Railway formed
Year 1956
Divisional system of administration planned
for various Zonal Railways.
Fully Air-conditioned Trains introduced between
Howrah-Delhi and Delhi-Bombay.
Year 1957
Indian Railways Institute for Signal Engineering
and Telecommunication (IRISET) at Secunderabad set up.
Research, Design and Standards Organisation (RDSO), Lucknow set up after merger of various Standards
Committees and CSO.
Year 1958
North East Frontier Railway formed.
Year 1959
Post of Member Mechanical created in the Railway
Board.
Year 1961
Diesel Locomotive Works (DLW) set up at Varanasi.
Chittaranjan Locomotive
Works (CLW) started manufacture of electric locomotives.
Year 1966
South Central Railway formed out of Central
Railway and Southern Railway.
First container service started between Bombay and Ahmedabad.
Year 1967
Start of use of Cement Concrete sleepers on
Indian Railways.
Year 1969
New Delhi – Howrah
Rajdhani Express introduced.
Year 1973
Chittaranjan Locomotive
Works stops production of Steam Locos.
Year 1974
Rail India Technical & Economic Services
Ltd. (RITES) formed.
Year 1976
Indian Railway Construction Corporation Ltd.
(IRCON) formed.
Year 1977
National Rail Museum for preservation and promotion of
heritage tourism, education and entertainment opened.
Year 1979
Central Organisation
for Railway Electrification (CORE) formed.
Year 1984
First Metro Rail System was introduced in Kolkata.
Year 1985
Computerised Passenger
Reservation System (PRS) introduced.
Year 1986
Indian Railways Institute for Electrical Engineering
(IRIEE) at Nasik set up.
Year 1987
Diesel Component Works (DCW) now DMW, Patiala set up.
Rail Coach Factory (RCF) established at Kapurthala.
Year 1988
First Shatabdi train
introduced between New Delhi and Jhansi.
Container Corporation of India (CONCOR) established..
Year 1989
Indian Railway Welfare Organisation
(IRWO) set up as a registered society.
Year 1991
Mass Rapid Transit System (MRTS) at Chennai
inaugurated.
Year 1992
Unigauge Policy adopted
on the Indian Railways.
Year 1998
Konkan Railway system
becomes fully operational.
Guinness certificate for “Fairy Queen’ of 1855
make – the oldest working steam Locomotive in the world.
Year 1999
Darjeeling Himalayan Railway declared World
Heritage site by UNESCO.
Guinness Certificate for Delhi Main Station
equipped with the World’s largest Route Relay Interlocking System.
Year 2002
Introduction of Jan Shatabdi
Trains.
East Central (Headquarters {HQ}-Hajipur) and North Western Railway (HQ-Jaipur)
become operational on 1st October.
Year 2003
East Coast Railway (HQ – Bhubaneswar); South East Central Railway (HQ-Bilaspur)’ West Central Railway (HQ-Jabalpur);
North Central Railway (HQ-Allahabad); South Western Railway (HQ-Hubli) opened on 1st
April.
Year 2004
Chhatrapati Shivaji Terminus building inscribed World Heritage status
by UNESCO. Reservation through Internet
introduced.
Year 2005
Nilgiri Mountain
Railway declared World Heritage Site by UNESCO.
E-ticketing introduce in all trains.
Year 2006
Introduction of free up-gradation of passengers
to higher classes of accommodation since 26.1.06.
Scheme, allowing private operators to run container
trains, launched.
Garib Rath introduced for common people with the facilities of AC
Class at affordable fares.
Munabao (India) – Khokrapar
(Pakistan) rail link was restored on 18.2.06.
Year 2007
A universal common
train enquiry telephone No. 139, introduced throughout the country.
Year 2008
Highest ever surplus (before dividend) of Rs. 25.000/- crore earned and highest ever
freight loading of 794 million tonnes achieved during
fiscal 2007-08.
First ever train service
flagged-off in Kashmir Valley on 11.10.08.
Agartala, capital
of Tripura, a state of North Eastern region was linked with rail network (PIB Features)
*Assistant
Director, Press Information Bureau, New Delhi.
RTS/VN
(Release ID :46428)