Year End Review – 2009
Ministry of New & Renewable Energy
|
Ministry of New and Renewable
Energy (MNRE) being the nodal Ministry of the Government of India at the
National level for all matters relating to new and renewable energy such as
solar, wind, biomass, small hydro, hydrogen, geothermal etc., during the year
2009, continued its endeavor to promote renewable energy technologies and
increase the contribution of renewable energy in the total energy mix in the
years to come.
It is implementing a
wide range of programmes on research and development,
demonstration and promotion of renewable energy for rural, urban, commercial
and industrial applications as well as for grid-interactive power generation.
Main activities/
achievements during the year 2009
During the
year 2009 the major initiatives & activities undertaken and the
achievements made are as follows:
v
A total of 1073.62 MW renewable energy covering 184
Villages + 86 Hamlets has been added during the year.
v 1056.12 MW
grid-interactive renewable power generation capacities have been added in the
country. The major contribution came from Wind Power (649 MW), Biomass Power
(113 MW), Small Hydro Power (91 MW) and Bagasse based
Cogeneration Power (192 MW).
v Off-grid/ distributed
Renewable Power of 17.5 MW equivalent capacity has been setup mainly from
Biomass/Non – bagasse cogeneration (10.6 MW) and
Biomass gasifiers (2.9 MW).
Details of cumulative
achievements as on 31.10.2009 are at annexure-1.
Solar Energy
§
The
Government has launched a Jawaharlal Nehru National Solar Mission. This Mission is one of the eight key National Missions which
comprise India’s
National Action Plan on Climate Change. It has twin objective – to contribute
to India’s
long term energy security as well as its ecological security. The Solar Mission
recommends a three stage implementation leading up to an installed capacity of
20,000 MW by the end of the 13th Five Year Plan in 2022.
§
Installation of 50 Kw solar power
plant and 100 street lights with full support from the Ministry completed in Rashtrapati Bhawan and inaugurated
by the President on 25th July, 2009.
§
The first megawatt scale capacity grid-interactive Solar
Photovoltaic Power Plant of the country has been setup in Asansol
district of West Bengal by West Bengal Green Energy Development Corporation.
§
A scheme to encourage banks for micro financing of solar
photovoltaic systems i.e., solar lightings, solar lanterns, solar pumps etc.
has been launched. The Banks will finance at the existing interest rate.
§
India’s largest Solar Steam
Cooking System has been set up in the New Prasadalaya
building of Shirdi Saibaba
Temple Complex which cooks food for about 17,000 persons per day. The project
was inaugurated by the Hon’ble Minister for New and
Renewable Energy on 30th July, 2009 at Shirdi.
§
In-principle approval has been given to 30 Cities for
developing as ‘Solar Cities’ in the country out of which sanctions have been
issued for 12 Cities for which the Master Plan is under preparation. The Solar City
aims at minimum 10% deduction in projected demand of conventional energy
through a combination of energy efficiency measures and enhancing supply from
renewable energy sources.
§
512 remote boarder villages in Arunachal
Pradesh have been illuminated through solar photovoltaic lighting systems.
§
Solar homelighting systems installed in 3900 households in 27
villages of Gurez tehsil in
Jammu & Kashmir to enable 30,000 people living in these villages to enjoy
the benefits of modern lighting.
Wind Energy
Wind energy accounts for
70% of total installed renewable energy generation capacity. In a major
initiative, Government has recently announced a scheme for Generation
Based Incentives of 50 paise per unit of
electricity fed into the grid from wind power projects subject to a maximum of Rs. 62.00 lakh per MW.
International
cooperation
- Joint working group meeting held in March, 09 of
Indo-Japan and Indo Australia
for cooperation in projects relating to R&D.
- MOU with Chile signed in March,09 in the presence of Prime Ministers of both the countries
for cooperation in Renewable Energy.
- Visit of solar trade mission of USA
in March,09 to explore investment opportunities.
- Indian delegation attended Canada-India Energy
Forum during 15-16 April,09.
- Union Minister led a delegation to Egypt
during 29th-30th June 09 to participate in Second
Preparatory Commission of IRENA.
- A meeting with the representative was held in
Ministry with USDOE on 29th June, 09 for cooperation in the
areas of Biofuel.
- The National Policy on Bio-fuels has been
approved by the Cabinet in its meeting held on 23rd July, 2009.
The policy will bring about accelerated development and promotion of the
cultivation, production and use of Bio-fuels to increasing the substitute
Petrol and Diesel for transport and be used in stationary and other
applications.
Information and public Awareness
§
The Rajiv Gandhi Akshay Urja Divas was celebrated
through out the country on 20th August, 2009 to create mass awareness among the
people about the utilization and advantages of Renewable Energy systems and
devices in their daily life. On this occasion, mass rallies, human chains/runs,
competitions such as essay writing, paintings, quiz and debates, etc. on the
theme of New and Renewable Energy sources were organized not only in the State
capitals and other major cities of different States but also in all the
districts of the country. The National function was organized at Jaipur which was inaugurated by the Hon’ble
Minister of New and Renewable Energy.
§
A scheme on ‘Special Area Demonstration Project’ has been
introduced on demonstration of Renewable Energy Systems/devices at places of
National and Inter national Importance, at centralized kitchens and at roadside
eating joints and restaurants where large flow of people and tourists takes
place every day with an objective to popularize the Renewable Energy Systems
and devices to create greater awareness.
§
Under the SADP scheme, the Ministry has sanctioned first
project of illumination, lighting and solar water heating system at Raj Bhawan, Kolkatta
through a 50 Kw solar power plant. The project was
inaugurated by the President on 7th December, 2009.
§
Under the SADP scheme, the Ministry has also sanctioned project of
illumination, lighting and solar water heating system at Raj
Bhawan, Raipur through a 45 Kw solar power plant on 21st December,
2009.
Other programmes
§
Under Remote Village Electrification Programme,
120 villages have been sanctioned.
§
About 30,000 family size biogas plants have been installed
in the country.
§
19 Water Mills were installed in the Uttarakhand
and Karnataka States.
§
Prime Minister’s special package for project on
electrification/illumination of border villages of Arunachal
Pradesh.
§
Preparation of developmental plan for Ladakh
Region is in progress.
§
Consultative meeting on improved chulhas
for rural households.
§
Consultative committee on Biomass cook stoves for urban and
rural application met and submitted it’s recommendations
New Schemes
Following New scheme were
launched during the year 2009 for promoting various renewable energy Programmes:
·
National Biogas and Manure Management Programme
(NBMMP) during the remaining period of the 11th Five year Plan was announced on
27th November, 2009.
·
Demonstration Programme on providing incentives to banks /micro financing
institutions to support installation of solar home lighting and other small
solar systems through loans in the country during the 11th Plan period
announced on 17th August, 2009.
·
Implementation of the Solar Photovoltaic (SPV) Programme during FY 2009-10 was announced on 10th
July, 2009.
·
Implementation of the ‘Solar
Lantern Programme’ during 2009-10 announced on 8th July, 2009.
·
Implementation of the Small Hydro Power Programme
up to 25 Mw capacity during FY 2009-10 was announced
on 11th December,, 2009.
·
Implementation of Biomass Gasifier based Distributed / Off-grid Programme
for Rural Areas and Grid Power Programme announced on
1st December, 2009.
·
Scheme for Development / Up-gradation
of Watermills and setting up Micro Hydel Projects (up
to 100 kW capacity) announced on 18th February, 2009.
·
Implementation the Programme on Energy Recovery from Urban Wastes during
the year 2009-10 announced on 18th August, 2009.
·
Programme
on Energy Recovery from Municipal Solid Waste during the year 2009-10 announced on
9th July, 2009.
·
Programme
on Recovery of Energy from Industrial Wastes during the year 2009-10 announced on
6th July, 2009.
·
New Technology Programmes/Schemes
for the year 2009-2010 announced on 11th June, 2009.
·
Implementation of HRD Programme during 2009-10 announced on 2nd June,
2009.
·
Implementation of Special Area
Demonstration Project Scheme during 2009-10 announced on 23rd July,
2009.
IREDA
Indian Renewable Energy Development
Agency Limited (IREDA), a Public Sector Enterprise under the Ministry of New
& Renewable Energy(MNRE), has presented the
dividend of Rs.11.25 crore for the financial year
2008-09. IREDA sanctioned 47 projects involving loan commitment of Rs.1489.93 crore registering an impressive growth of 80.35%. The loan sanctioned will result in
establishment of additional renewable power generation capacity of about 403.75
MW.
Click here for -: ANNEXURE
***********
PRA/SKK